[1]
Смирнов, А., Левашов, В., Сидоренко, Д., Гадяка, В. and Маркушин, А. 2010. It is settlement-experimental research soaking up and exhaust paths GTE of power unit of gas-turbine power stations GTPS with engine NK-16ST. Eastern-European Journal of Enterprise Technologies. 3, 3(45) (Apr. 2010), 32–36. DOI:https://doi.org/10.15587/1729-4061.2010.2792.