[1]
Dorozhko, Y., Batrakova, A., Tymoshevskyi, V. and Zakharova, E. 2021. Ensuring adhesion between the asphalt-concrete road surface and rigid base at the roadbed design stage . Eastern-European Journal of Enterprise Technologies. 3, 7 (111) (Jul. 2021), 84–92. DOI:https://doi.org/10.15587/1729-4061.2021.235394.