[1]
Lebid, I., Luzhanska, N., Lebid, I., Mazurenko, A., Mykhailenko, I. and Sharai, S. 2025. Construction of a simulation model of the work of a warehouse enterprise as a link in the logistics chain. Eastern-European Journal of Enterprise Technologies. 5, 3 (137) (Oct. 2025), 36–45. DOI:https://doi.org/10.15587/1729-4061.2025.341456.