Lebid, I., Luzhanska, N., Lebid, I., Mazurenko, A., Mykhailenko, I., & Sharai, S. (2025). Construction of a simulation model of the work of a warehouse enterprise as a link in the logistics chain. Eastern-European Journal of Enterprise Technologies, 5(3 (137), 36–45. https://doi.org/10.15587/1729-4061.2025.341456