Lebid, I., Luzhanska, N., Lebid, I., Mazurenko, A., Mykhailenko, I. and Sharai, S. (2025) “Construction of a simulation model of the work of a warehouse enterprise as a link in the logistics chain”, Eastern-European Journal of Enterprise Technologies, 5(3 (137), pp. 36–45. doi: 10.15587/1729-4061.2025.341456.