[1]
Дорохіна, А.А., Старостіна, А.Ю. and Артюх, Р.В. 2018. THE MODEL FOR DETERMINING THE SEQUENCE OF WORKS AND OPERATIONS TO MANAGE THE TIMETABLE OF A CONSTRUCTION PROJECT. INNOVATIVE TECHNOLOGIES AND SCIENTIFIC SOLUTIONS FOR INDUSTRIES. 4 (6) (Dec. 2018), 33–41. DOI:https://doi.org/10.30837/2522-9818.2018.6.033.