[1]
Поповиченко, И.В. 2014. Risk assessment of the investment decision in the system "time constraints-cost"(by the example of construction). Technology audit and production reserves. 6, 2(20) (Dec. 2014), 28–35. DOI:https://doi.org/10.15587/2312-8372.2014.31470.