[1]
Кондратов, С.А. and Аль Хамадани, Д.М. 2015. Defining and classification of the soft projects as a base for their scope planning. Technology audit and production reserves. 1, 4(21) (Jan. 2015), 20–25. DOI:https://doi.org/10.15587/2312-8372.2015.38048.