[1]
Колесникова, К.В., Монова, Д.А., Торопенко, А.В., Торопенко, О.В. and Алі, А.Ш.О.М. 2016. The project management of the building structure reengineering by the limits in all functional areas. Technology audit and production reserves. 5, 2(31) (Sep. 2016), 18–23. DOI:https://doi.org/10.15587/2312-8372.2016.79982.