FEATURES OF MODERN AIR SEPARATION PLANT
DOI:
https://doi.org/10.18198/j.ind.gases.2008.0349Keywords:
Air separation plant, Oxygen, Nitrogen, Argon, Hydrogen, Internal compression of oxygen, Low-temperature rectification, Regular packing, Aluminium, Refrigerating ma-chine, Adsorber, Clearing and dehydration of air, Heat-exchanger apparatusAbstract
The cryogenic air separation technology is used since more than 100 years for production of oxygen, nitrogen and argon. The modern trends in the air separation are discussed in the present paper. One of them is, that the specific cost of the system becomes more important during the optimization last time. The high availability and reliability is a further significant optimization parameter, while the power consumption is secondary parameter only often. Therefore the use of internal compression for oxygen pressurisation instead of the more dangerous and expensive oxygen compressors becomes more popular. Some basic principles for conceptual design of modern air separation plants made by «Linde» are described in this paper. According to this concept the packed columns are used for production of argon as well as purification units based on molecular sieve adsorption without refrigerators. The whole low-temperature part of the air separation plant is made from aluminium. An further essential issue is that the company «The Linde Group» is able to manufacture all kind of key equipment for low temperature systems.
Downloads
Issue
Section
License
LICENSE AGREEMENT
After receiving an article for publication as required revision scientometric databases each author directs the license agreement on the assignment and transfer of the management of copyright. Signatures of the author (s) it is desirable to seal the personnel department of the institution where the author works (authors), or the seal of the Faculty.
Revision refers to the authors one layout for proofreading. Permissible only those fixes that result in compliance with the layout of the original text of the article. Significant changes are not permitted. Layout should be sent to the editorial office within days of receipt.