THE IMPROVEMENT OF LNG-INSTALLATIONS OF MEDIUM CAPACITY WITH THE EXTERNAL CRYOGENIC NITROGEN EXPANDER CYCLE
DOI:
https://doi.org/10.18198/j.ind.gases.2014.0744Keywords:
Liquefied natural gas (LNG), LNG-plant, Cryogenic engineering, Nitrogen, Cryogenic nitrogen expander cycle, Turbo expander-compressor unit, Refrigerating machine, Specific energy consumptionAbstract
There is currently a demand for LNG-plants with the capacity ranged from 5 to 20 t/h. The analysis showed that sufficiently efficient installations of the given capacity can be developed on the basis of the external cryogenic nitrogen expander cycle. In the course of further study it was found that when LNG-plant with the capacity up to 10 t/h is made the preference to the scheme with a turbo expander-compressor unit and pre-cooling stage of nitrogen by a refrigerating machine should be given. The minimum value of the specific energy consumption of 0,66 kWh/kg for the liquefaction of natural gas was achieved in LNG-plant at the optimum temperature of 233 K for nitrogen pre-cooling by a refrigerating machine. At JSC «Cryogenmash» for a customer was developed a project of LNG-plant with the capacity of 7 t/h which uses the optimal mode and circuit parameters found in the course of minimization of the specific energy consumption for the liquefaction of natural gas. JSC «Cryogenmash» is already underway manufacturing and supplying the equipment of LNG-plant for the customer.
References
Bezrukov K.V., Dovbish A.L., Peredelskiy V.A. (2008). Block unit by productivity of 1,5 t/h for liquefaction of natural gas// Tekhnicheskie Gazy. [Industrial Gases].— № 3. — P. 64-67. (Rus.).
Dovbish A.L., Peredelskiy V.A., Bezrukov K.V. et al. (2012). Experience of creation block-liquefaction of LNG-units small productivity// Tekhnicheskie Gazy. [Industrial Gases]. — № 2. — P. 42-45. (Rus.).
Kuzmenko I.F., Dovbish A.L., Bezrukov K.V., Peredelskiy V.A. (2012). Scientific and engineering base, development and production experience of «Cryogenmash» — improvement LNG-equipment//Tekhnicheskie Gazy. [Industrial Gases]. — № 3. — P. 17-23. (Rus.).
Kunert S. (2008). Small is beautiful – Mini LNG concept// Presentation Hamworthy Gas Systems for Conference «The potential of bio-energy for future energy supply». — Leipzig. — 25 p.
Jianlu Zhu, Yuxing Li, Yonghao Liu, Weiwei Wang (2010). Selection and Simulation of Offshore LNG Liquefaction Process.// Proceedings of the Twentieth. International Offshore and Polar Engineering Conference. — Beijing. China. — Р. 25-32.
Tim Eggeman, Steve Chafin. (2003). Pitfalls of CO2 freezing prediction. Presented at the 82nd Annual Convention of the Gas Processors Association. — San Antonio. Texas. — 19 p.
Malkov M.P., Danilov I.B., Zeldovich A.G., Fradkov A.B. (1963). Handbook of physical-technical basis of deep cooling. — М.-L.: Gosenergoizdat.— 416 p. (Rus.).
Foglietta J.N. Consisder dual independent expander refrigeration for LNG production// Special report. Hydrocarbon processing. January 2004. — Р. 39-44.
Taotao Shen, Wensheng Lin. (2011). Calculation of Carbon Dioxide Solubility in Liquefield Natural Gas// International Journal of Chemical Engineering and Application. — V. 2. — № 5. — P. 366-371.
Downloads
Issue
Section
License
LICENSE AGREEMENT
After receiving an article for publication as required revision scientometric databases each author directs the license agreement on the assignment and transfer of the management of copyright. Signatures of the author (s) it is desirable to seal the personnel department of the institution where the author works (authors), or the seal of the Faculty.
Revision refers to the authors one layout for proofreading. Permissible only those fixes that result in compliance with the layout of the original text of the article. Significant changes are not permitted. Layout should be sent to the editorial office within days of receipt.