Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages

Authors

  • А. Л. Шубенко A. N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine, Ukraine
  • О. А. Бабенко A.N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine, Ukraine
  • В. Н. Голощапов A.N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine, Ukraine
  • Н. В. Лыхвар A.N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine, Ukraine
  • А. Ю. Козлоков PJSC "Kharkiv CHPP-5", Ukraine

Abstract

In case of emergency or planned repair work a method of heating turbine T-100/120-130 network with one upper heater is provided. The results of computational modeling of thermal and electrical loads of units number 1 and number 2 PLC "Kharkov HPS-5" are presented.

Author Biographies

А. Л. Шубенко, A. N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine

Corresponding Member of NAS of Ukraine, Doctor of Technical Sciences, Professor

В. Н. Голощапов, A.N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine

PhD

Н. В. Лыхвар, A.N. Podgorny Institute for Mechanical Engineering Problems of NAS of Ukraine

PhD

Published

2015-08-07

Issue

Section

Power Engineering