The train formation technology improvement at the railway junctions

Authors

DOI:

https://doi.org/10.15587/2313-8416.2014.29269

Keywords:

station, junction, locomotive, wagon, planning, accumulation, formation, transport, railway, irregularity

Abstract

Usage a flexible approach to the formation of transmission trains at the stations of railway junctions taking into account the daily irregularity was proposed to improve operational planning of transporting of the local cargo between stations in a railway junction under the conditions of the improvement of the usage of vehicles. It is possible to reduce downtime in the parks of dispatch due to the multidiscipline usage of train locomotives and rationalization of maneuvers.

Author Biographies

Юлія Віталіївна Рибалка, Ukrainian State Academy of Railway Transport Feuerbach sqr, 7, Kharkiv, Ukraine, 61050

Department of Management of operational work 

Григорій Михайлович Сіконенко, Ukrainian State Academy of Railway Transport Feuerbach sqr, 7, Kharkiv, Ukraine, 61050

PhD, Associate Professor

Department of Management of operational work

References

Xie, J. B., Gao, L., Zhang, J. (2011). Wagon Hours Saved by Transferring Wagons without Sorting Operations at Technical Station. Applied Mechanics and Materials, 97-98, 498–502. doi: 10.4028/www.scientific.net/amm.97-98.498

Liu, R., Whiteing, A., Koh, A. (2013). Challenging established rules for train control through a fault tolerance approach: applications at a classic railway junction. Proceedings of the Institution of Mechanical Engineers, Part F, 227 (6), 685–692. doi: 10.1177/0954409713496988

Eaton, J., Yang, Sh. (2014). Dynamic railway junction rescheduling using population based ant colony optimization. 14th UK Workshop on Computational Intelligence (UKCI). doi: 10.1109/ukci.2014.6930174

Hammadi, S., Ksouri, M. (2013). Optimization of Traffic at a Railway Junction: Scheduling Approaches Based on Timed Petri Nets. Multimodal Transport Systems, 199–251. doi: 10.1002/9781118577202.ch5

Ho, T. K., Yeung, T. H. (2010). Railway junction conflict resolution by genetic algorithm. Electronics Letters, 36 (8), 771–772. . doi: 10.1049/el:20000570

Bernhard, K. A. (1953). Normyrovanyya razmerov dvyzhenyya peredatochnykh poezdov v zheleznodorozhnykh uzlakh. Tekhnyka zheleznykh doroh, 4, 21–25.

Pervozvanskyy, A. A. (1973). Matematycheskye modely v upravlenyy proyzvodstvom. Nauka, 615.

Habasov, R. F., Kyryllova, F. M. (1981). Metody optymyzatsyy. BHU, 350.

Balaka, Ye. I., Zorina, O. I., Kolesnykova, N. M., Pysarevs'kyy, I. M. (2005). Otsinka ekonomichnoyi dotsil'nosti investytsiy v innovatsiyni proekty na transporti. UkrDAZ, 210.

Syhorskyy, V. (1975). Matematycheskyy apparat inzhenera. Transport, 768.

Published

2014-11-24

Issue

Section

Technical Sciences