Improvement of the method of drilling and blasting operations at the use of explosive substance «Ukrainite» in underground mining works

Authors

  • Mykola Stupnik State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0002-9861-2798
  • Vsevolod Kalinichenko State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0002-1938-2286
  • Boris Rymarchuk State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0002-7081-3344
  • Serhii Pysmennyi State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0001-5384-6972
  • Mykhailo Fedko State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0003-4169-7425
  • Elena Kalinichenko State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027, Ukraine https://orcid.org/0000-0002-9138-9271

DOI:

https://doi.org/10.15587/2312-8372.2018.152055

Keywords:

least resistance line, specific explosive charge, well diameter, rock strength factor, explosive

Abstract

The object of research is a rock massif of iron ore, which is destroyed by an explosive located in deep wells. One of the most problematic places is ensuring uniform grinding of the rock massif during underground mining of mineral deposits at great depths. In the Kryvyi Rih iron ore basin (Kryvyi Rih, Ukraine) in underground mining let’s use the Ukrainian-made Grammonite 79/21 explosive, which provided an opportunity to obtain high-quality grinding of the ore mass to a depth of 1200 m. With a decrease in mining, these indicators deteriorate significantly, due to the manifestations of rock pressure, which leads to the overcoming of wells and increased specific charge for blasting.

A comprehensive method is used based on an analysis of existing methods that affect the specific charge of an explosive. According to practice data, it is found that when using an emulsion explosive in mining operations, the specific consumption of an explosive decreases, while the cost of extraction decreases and the quality of grinding of the massif improves. However, due to the lack of a methodology for calculating the parameters of drilling and blasting operations, the «Ukrainite PP-1» emulsion explosive is not widely used. The development of the methodology taking into account the characteristics of the «Ukrainite PP-1» emulsion explosive will improve the extraction of ore mass.

It is shown that the use of «Ukrainite PP-1» emulsion explosive leads to a decrease in the total length of wells by 35 %, and a decrease in production costs. This is due to the fact that the proposed method of calculation has the peculiarity of taking into account the specific costs of emulsion explosives obtained by pilot tests, in particular, the efficiency coefficient of emulsion explosives.

Due to this, the costs of drilling and blasting work are reduced and it is possible to obtain a calculated economic effect from the introduction of this technology at the level of 0.6 c. u./t. The proposed pattern of drilling the massif by the downward fans, compared with similar known, can reduce the time for drilling and improve the grinding of the rock massif without changing technology.

Author Biographies

Mykola Stupnik, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

Doctor of Technical Sciences, Professor

Department of Underground Mining of Mineral Deposits

Vsevolod Kalinichenko, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

Doctor of Technical Sciences, Professor

Department of Underground Mining of Mineral Deposits

Boris Rymarchuk, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

Doctor of Technical Sciences, Professor

Department of Underground Mining of Mineral Deposits

Serhii Pysmennyi, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

PhD, Associate Professor

Department of Underground Mining of Mineral Deposits

Mykhailo Fedko, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

PhD, Associate Professor

Department of Underground Mining of Mineral Deposits

Elena Kalinichenko, State Institution of Higher Education «Kryvyi Rih National University», 11, Vitaliia Matusevycha str., Kryvyi Rih, Ukraine, 50027

PhD, Associate Professor

Department of Underground Mining of Mineral Deposits

References

  1. Agoshkov, M. I., Borisov, S. S., Boyarskiy, V. A. (1983). Razrabotka rudnykh i nerudnykh mestorozhdeniy. Moscow: Nedra, 424.
  2. Stupnik, N. I., Pis'mennyy, S. V. (2012). Perspektivnye tekhnologicheskie varianty dal'neyshey otrabotki zhelezorudnykh mestorozhdeniy sistemami s massovym obrusheniem rudy. Vіsnik Krivorіz'kogo natsіonal'nogo unіversitetu, 30, 3–7.
  3. Chernykh, A. D., Kolosov, V. A., Bryukhovetsʹkyy, O. S. (2005). Kompleksna rozrobka rudnykh rodovyshch. Tekhnika, 376.
  4. Bondarenko, V. I., Kuzmenko, A. M., Hryadushchyy, Yu. B. (2002). Tekhnolohiya pidzemnoyi rozrobky plastovykh rodovyshch korysnykh kopalyn. Dnipro: RVK NHU, 730.
  5. Kaplenko, Yu. P. (1977). Instruktsiya po vyboru parametriv BPR pry otboyke rudy hlybokymy sverdlovynamy. Kryvyy Rih: KHRY, 28.
  6. Borysenko, S. H. (1987). Tekhnolohiya pidzemnoyi rozrobky rudnykh rodovyshch. Kyiv: Vyshcha shkola. Holovne vydavnytstvo, 262.
  7. Byzov, V. F., Korzh, V. A. (2003). Pidzemni hirnychi roboty. Vol. XII. Kryvyy Ri: Mineral, 286.
  8. Imenitov, V. R. (1984). Protsesy podzemnykh gornykh rabot pri razrabotke rudnykh mestorozhdeniy. Moscow: Nedra, 528.
  9. Malakhov, G. M., Martynov, V. K., Faustov, G. T., Kucheryavenko, I. A. (1968). Osnovnyye raschety sistem razrabotki rudnykh mestorozhdeniy. Moscow: Nedra, 273.
  10. Stupnіk, N. I., Kalinichenko, V. A., Pysmennyi, S. V., Fedko, M. B., Muzyka, I. O., Kalinichenko, E. V. (2016). Obhruntuvannya parametriv ochysnoyi kamery parabolichnoyi formy pry vidpratsyuvanni zaliznykh rud v nestiykykh porodakh. Hirnychyy visnyk, 101, 7–12.
  11. Stupnik, N., Kalinichenko, V., Pismennyi, S. (2013). Pillars sizing at magnetite quartzites room-work. Mining of Mineral Deposite. A Balkema Book, 11–15. doi: http://doi.org/10.1201/b16354-4
  12. Khomenko, O. Ye., Kononenko, M. N., Zubko, S. A. (2015). Protsessy pri podzemnoy razrabotke rudnykh mestorozhdeniy. Dnipro: NGU, 202.
  13. Chernokur, V. R., Shkrebko, G. S., Shelegeda, V. I. (1992). Dobycha rud s podetazhnym obrusheniyem. Moscow: Nedra, 237.
  14. Stupnik, M. I., Pysmennyi, S. V. (2012). Kombinovani sposoby podalʹshoyi rozrobky zalizorudnykh rodovyshch Kryvorizʹkoho baseynu. Hirnychyy visnyk, 95 (1), 3–7.
  15. Khomenko, O. Ye. (2007). Usovershenstvovaniye tekhnologii dobychi zheleznykh rud iz okhrannykh tselikov. Dnipro: NGU, 99.
  16. Byzov, V. F., Fedorenko, P. Y. (2001). Vybukhovi roboty. Vol. X. Biblioteka hirnychoho inzhenera. Kryvyi Rih: Mineral, 225.
  17. Andreyev, K. K., Belyayev, A. F. (1960). Teoriya vzryvchatykh veshchestv. Moscow: Oborongiz, 596.
  18. Tsarikovskiy, V. V., Grigoryev, A. P. (2004). Perspektivy primeneniya razlichnykh sistem razrabotki pri podzemnoy dobyche rud v Krivbasse. Razrabotka rudnykh mestorozhdeniy, 85, 164–167.
  19. Tkachuk, K. N., Fedorenko, P. I. (1990). Vzryvnyye raboty v gorno-rudnoy promyshlennosti. Kyiv: Vishcha shkola, 295.
  20. Kaplenko, Yu. P., Kolosov, V. A., Shvager, N. Yu. (2007). Instruktivno-metodicheskiye ukazaniya po vyboru parametrov burovzryvnykh rabot (BVR) pri podzemnoy dobyche rud. P. I. Vybor parametrov BVR pri provedenii vyrabotok. Mineral, 193.
  21. Dineva, S., Boskovic, M.; Wesseloo, J. (Ed.) (2017). Evolution of seismicity at Kiruna Mine. in Proceedings of the Eighth International. Conference on Deep and High Stress Mining. Australian Centre for Geomechanics. Perth, 125–139.
  22. Biruk, Y. (2010). Investigation of Rock-fall and Support Damage Induced by Seismic Motion at Kiirunavaara Mine. Mwagalanyi Hannington, 74.
  23. Lutsenko, I., Fomovskaya, E., Koval, S., Serdiuk, O. (2017). Development of the method of quasi-optimal robust control for periodic operational processes. Eastern-European Journal of Enterprise Technologies, 4 (2 (88)), 52–60. doi: http://doi.org/10.15587/1729-4061.2017.107542
  24. Lutsenko, I., Fomovskaya, O., Konokh, I., Oksanych, I. (2017). Development of a method for the accelerated two-stage search for an optimal control trajectory in periodical processes. Eastern-European Journal of Enterprise Technologies, 3 (2 (87)), 47–55. doi: http://doi.org/10.15587/1729-4061.2017.103731
  25. Stupnik, M. I., Kalinichenko, V. O., Fedko, M. B., Kalinichenko, O. V., Muzyka, I. O., Pysmennyi, S. V. (2017). Udoskonalennya metodyky vyznachennya parametriv burovybukhovykh robit z urakhuvannyam napruzheno-deformovanoho stanu masyvu pry yoho obvalenni na pokhyle oholennya. Hirnychyy visnyk, 102, 47–53.

Published

2018-05-31

How to Cite

Stupnik, M., Kalinichenko, V., Rymarchuk, B., Pysmennyi, S., Fedko, M., & Kalinichenko, E. (2018). Improvement of the method of drilling and blasting operations at the use of explosive substance «Ukrainite» in underground mining works. Technology Audit and Production Reserves, 6(1(44), 29–35. https://doi.org/10.15587/2312-8372.2018.152055

Issue

Section

Materials Science: Original Research