Analysis of approaches to develop of the competents system of the project team of the building company virtual logistic center creation

Authors

DOI:

https://doi.org/10.15587/2312-8372.2017.118422

Keywords:

project management, construction logistics, project competence, organizational and individual competencies

Abstract

The object of research is the system of development of individual and organizational competence in the project of creating a virtual logistics center of a construction company. One of the most problematic places is the lack of systematic approach in construction organizations for development of personnel, the improvement of organizational competencies and the formation of technological maturity in the field of project management. To address these shortcomings, the project considers the filling of 28 competencies according to the model of the International Project Management Association. Based on the models of the International Project Management Association and Harold Kerzner, a combined model for development of organizational and individual competencies is proposed. In the model, the levels of technological maturity in the field of project management are aligned with the main elements of competencies inherent in the levels, as well as the main values. The tasks that the system for managing the development of the competence of the project team for creating a virtual logistics center for a construction company should be formulated. In the course of the study, the method of analyzing international standards and the synthesis method for constructing a combined model was used.

An effective mechanism for the associated development of individual and organizational competencies in the construction organization is obtained. This is due to the fact that the proposed combined model has a number of features, in particular, system, the interconnectedness of individual and organizational elements of competence, the existence of a value dimension. Thanks to this, it is possible to increase the efficiency of organizational activities of construction organizations as a result of using the model by 10–15 %. In comparison with similar known models, this provides such advantages as: the interconnected development of individual and organizational competencies, the value measurement of competence and the possibility of constructing an integral value-competence strategy for the development of a construction organization.

Author Biographies

Yevgen Antypenko, Zaporizhzhya National Technical University, 64, Zhukovsky str., Zaporizhzhya, Ukraine, 69063

Doctor of Technical Sciences, Professor

Department of Construction Production and Project Management

Andrii Ivko, Zaporizhzhya National Technical University, 64, Zhukovsky str., Zaporizhzhya, Ukraine, 69063

Postgraduate Student

Department of Construction Production and Project Management

References

  1. Kerzner, H. (2009). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. New Jersey: Wiley, 1120.
  2. IPMA Organisational Competence Baseline (IPMA OCB) for Developing Competence in Managing by Projects. Version 1.1. (2016). Amsterdam: International Project Management Association, 105.
  3. A Guide to the Project Management Body of Knowledge (PMBOK® Guide). (2013). Project Management Institute, 589.
  4. Organizational Project Management Maturity Model (OPM3®). Ed. 3. (2013). Project Management Institute, 246.
  5. Individual Competence Baseline for Project, Programme & Portfolio Management. Version 4.0. (2015). Zurich: IPMA. Available at: http://products.ipma.world/ipma-product/icb/read-icb/
  6. In: Bushuyev, S. D. (2009). Rukovodstvo po upravleniiu innovatsionnymi proektami i programmami. Vol. 1, Version 1.2. Kyiv: Naukovii svіt, 173.
  7. Adizes, I. (1983). How to Solve the Mismanagement Crisis: Diagnosis and Treatment of Management Problems. Carpinteria: Adizes Institute, 281.
  8. Bushuyev, S., Bushueva, N., Yaroshenko, R. (2012). Harmonization models property development programmer in turbulence environment. Management of Development of Complex Systems, 10, 9–13.
  9. Bushueva, N. S. (2007). Modeli i metody proaktivnogo upravleniia programmami organizatsionnogo razvitiia. Kyiv: Naukovii svіt, 199.
  10. Pokolenko, V. O. (2001). Formuvannia ratsionalnoho skladu uchasnykiv vtilennia investytsiinykh proektiv. Naukovyi visnyk budivnytstva, 16, 102–106.

Published

2017-11-30

How to Cite

Antypenko, Y., & Ivko, A. (2017). Analysis of approaches to develop of the competents system of the project team of the building company virtual logistic center creation. Technology Audit and Production Reserves, 6(2(38), 40–46. https://doi.org/10.15587/2312-8372.2017.118422

Issue

Section

Systems and Control Processes: Original Research