Value based scope management of innovation projects in crisis conditions
DOI:
https://doi.org/10.15587/2312-8372.2015.40878Keywords:
project management, scope management, value-based management, innovation project, crisis managementAbstract
During the research process of value-based scope management of Innovation projects in crisis conditions it was created a system of criteria, which can be used for evaluation of the projects operations in aspect of their importance for delivering Value in the final product of the Innovation project. Thurstone method was used for the analysis of the experts’ evaluation results. It enabled to identify the most important project operations for the further redesigning of the WBS.
During the crisis economic situation a manager has to keep project successful while decreasing finances. The Value-based approach was chosen for the decision making efficiency increasing. This approach allows to concentrate on choosing the most important project operations, and save the Value of the final product.
A system of criteria of Innovation project success was proposed as result of the research. Also it was proposed a procedure of experts’ evaluation analyzing, which allows to range project operations for WBS redesigning.
The results of the research are considered to be useful as there is an opportunity to range Innovation project operations effectively in crisis conditions.
References
- Bykovskii, V. V., Mishchenko, E. S., Bykovskaia, E. V. (2011). Upravlenie innovatsionnymi proektami i programmami. Tambov: GOU VPO TGTU, 104.
- Sergeev, V. A., Kipcharskaia, E. V., Podymalo, D. K.; In: Sergeeva, V. A. (2010). Osnovy innovatsionnogo proektirovaniia. Ul'ianovsk: UlGTU, 246.
- Rukovodstvo k Svodu znanii po upravleniiu proektami (Rukovodstvo PMBOK). (2013). Ed. 5. Project Management Institute. Available: http://rutracker.org/forum/viewtopic.php?t=4687650
- Bobryshev, A. D. (2011). Vyiavlenie i issledovanie problemnyh polei v organizatsii deiatel'nosti kompanii, na kotorye okazyvaet vliianie krizis. Problemy prognozirovaniia, 2, 127-136.
- Popov, V. L. (2009). Upravlenie innovatsionnymi proektami. M.: INFRA-M, 336.
- Bushuev, S. D., Bushueva, N. S., Yaroshenko, R. F. (2012). Model' garmonizatsii tsennostei programm razvitiia organizatsii v usloviiah turbulentnosti okruzheniia. Upravlіnnia rozvitkom skladnih sistem, 10, 9-13.
- Ohara, S. (2005). A Guidebook of Project & Program Management for Enterprise Innovation: Volume 2. Project Management Association of Japan, 238.
- Münch, J., Fagerholm, F., Johnson, P., Pirttilahti, J., Torkkel, J., Jäarvinen, J. (2013). Creating Minimum Viable Products in Industry-Academia Collaborations. Lecture Notes in Business Information Processing, Vol. 167, 137–151. doi:10.1007/978-3-642-44930-7_9
- Tolstova, Yu. N. (2003). Izmerenie v sotsiologii. M.: INFRA-M, 312.
- Otbor i otsenka innovatsionnyh proektov. Tehnologicheskii park Mogilev. Available: http://www.technopark.by/business/206.html
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2016 Тигран Георгиевич Григорян, Алексей Сергеевич Корзняков
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.