The improvement of train formation interaction on technical stations with train schedule

Authors

DOI:

https://doi.org/10.15587/2312-8372.2014.28081

Keywords:

train formation, railway yard, train schedule, train downtime

Abstract

It is shown that one of the measures to ensure the effectiveness and reliability of the schedule is use of flexible weighted norms. As a result of working conditions research of railway yards at sending of trains using flexible standards of weight and length of train will be found that flexible train formation management will reduce the interoperable down time, including downtime of trains awaiting departure at 60-80%.

Irregularity reducing favorably affects both their performance and the performance of those companies that it serves. Therefore, in order to keep the constant movement size on the assumption of uniform departure of trains is advisable to reduce the minimum, or increase the maximum norm.

Implementation of freight trains movement technology according to schedule is better starting with sites and directions with stable train flows. 

Author Biographies

Дмитро Борисович Стахорний, Ukrainian State Academy of Railway Transport

Department of Management of operational work

Олена Анатоліївна Малахова, Ukrainian State Academy of Railway Transport

Ph.D., Associate Professor

Department of Management of operational work 

References

  1. Wang, X., Rong, L. (2013, October 9). Marshalling Yard Simulation Based on BP Neural Network Model. ICTE 2013. American Society of Civil Engineers, 1117-1122. doi:10.1061/9780784413159.162

    Yun Jing, Shiwei He, Rui Song. (2012). Model and Algorithm of Stage Plan for Railway Marshalling Station Based on Sequence Theory. International Journal of Digital Content Technology and its Applications, Vol. 6, № 17, 258–268. doi:10.4156/jdcta.vol6.issue17.28

    Ding, X., Xu, X. (2014, June 24). Urban Rail Train Marshalling Optimization Based on Multiple Operation Modes. CICTP 2014. American Society of Civil Engineers, 1652-1660. doi:10.1061/9780784413623.159

    Laik, N., Hadjiconstantinou, E. (2008, October). Evaluation of operational plans in container terminal yards using Discrete-Event Simulation. OR Insight, Vol. 21, № 4, 10–18. doi:10.1057/ori.2008.16

    Xue, F., Wang, C. (2007, July 9). A Method of Exchange Wagon-Flow Allocating in Bidirectional Marshalling Yards. International Conference on Transportation Engineering 2007. American Society of Civil Engineers, 2241-2246. doi:10.1061/40932(246)367

    Akulynychev, V., Kudryavtsev, V., Koreshkov, A. (1981). Matematycheskye metodi v ekspluatatsyy zheleznykh doroh. М.: Transport, 224.

    Syhorskyy, V. (1975). Matematycheskyy apparat inzhenera. K.: Tehnika, 768.

    Nekrashevych, V. (2006). Problemy adaptatsyy hrafyka dvyzhenyya hruzovykh poezdov k kolebanyyam vahonopotokov. Vestnyk VNIIZhT, № 4, 5-12.

    Shapkyn, I. (2009). Orhanyzatsyya zheleznodorozhnykh perevozok na osnove informatsyonnykh tekhnolohyy. М.: MIIT, 23.

    But'ko, T., Dan'ko, M., Sikonenko, G. (2002). Do pytannya vyznachennya optymal'noyi kil'kosti sortuval'nykh stantsiy. Kommunal'noe khozyaystvo horodov, 45, 237-242.

Published

2014-10-02

How to Cite

Стахорний, Д. Б., & Малахова, О. А. (2014). The improvement of train formation interaction on technical stations with train schedule. Technology Audit and Production Reserves, 5(1(19), 13–17. https://doi.org/10.15587/2312-8372.2014.28081

Issue

Section

Technology audit