Reliability evaluation of automated monitoring of rock cutting tool condition

Authors

  • Ігор Іванович Чигур Ivano-Frankivsk National Technical University of Oil and Gas Karpatska str., 15, Ivano-Frankivsk, Ukraine, 76019, Ukraine https://orcid.org/0000-0002-0023-3328

DOI:

https://doi.org/10.15587/1729-4061.2014.26253

Keywords:

control, system, condition, drilling, identification, recognition, prediction, rock cutting, chisel, reliability

Abstract

When drilling oil and gas wells, the problem of reliable detection of time of rock cutting tool replacement because of its wear remains unsolved. To solve it, the automated control system of the rock cutting tool condition with the functions of identifying, recognizing, predicting and selecting the strategy of monitoring the exhaustion of the tool was developed. To increase the system performance, the analysis of its subsystems in terms of their impact on the overall control reliability index was carried out. It was found that recognition and prediction subsystems are the most responsible. To implement the algorithms of these subsystems, it is proposed to use neuro and fazzi- artificial intelligence technologies that have proven their efficiency in such tasks. The results obtained are important since they indicate the effective ways to solve the problem, moreover they can be also applied to other problems of this type.

Author Biography

Ігор Іванович Чигур, Ivano-Frankivsk National Technical University of Oil and Gas Karpatska str., 15, Ivano-Frankivsk, Ukraine, 76019

Associate Professor

Department of  Process Automation and Monitoring in Ecology

References

  1. Semencov, G. N., Chigur, І. І. (2007). Osnovnі koncepcії stvorennja avtomatizovanoї sistemi kontrolju za tehnіchnim stanom porodorujnіvnogo іnstrumentu. Naftogazova energetika, 1, 61–63.
  2. Semencov, G. N., Gorbіjchuk, M. І., Chigur, І. І. (2001). Matematichnij analіz kriterіїv vіdpracjuvannja dolіt. Naftova і gazova promislovіst', 6, 15–19.
  3. Shageev, A. F., Timusheva, A. M., Shagaeva, L. N., Grishin, A. S. (2000). Avtomatizirovannyj monitoring processov obrabotki skvazhin – pervaja stupen' intellektual'nyh sistem upravlenija. Neftjanoe hozjajstvo, 11, 48–49.
  4. Belikov, V. G., Postash, S. A. (1972). Racional'naja otrabotka i iznosostojkost' sharoshechnyh dolot. Moscow: Nedra, 160.
  5. Bareev, M. B., Astaf'ev, I. I. (1991). O kriterijah iznosostojkosti vooruzhenija dolot. Neftjanoe hozjajstvo, 7, 7–10.
  6. Zhu, X., Liu, Y., Tong, H. (2014). Analysis of reamer failure based on vibration analysis of the rock breaking in horizontal directional drilling. Engineering Failure Analysis, 37, 64–74. doi:10.1016/j.engfailanal.2013.11.016
  7. Tang, J., Lu, Y., Ge, Z., Xia, B., Sun, H., Du, P. (2014). A new method of combined rock drilling. International Journal of Mining Science and Technology, 24 (1), 1–6. doi:10.1016/j.ijmst.2013.12.001
  8. Chigur, І. І. (2000). Rozrobka metodu kontrolju tehnіchnogo stanu sharoshkovih dolіt v umovah neviznachenostі procesu burіnnja. Іvano-Frankіvs'kij nacіonal'nij tehnіchnij unіversitet nafti і gazu. Іvano-Frankіvs'k, 20.
  9. Sitnikov, N. B. (2000). Modelirovanie i optimizacija processa burenija geologorazvedochnyh skvazhin. Ural'skaja gosudarstvennaja gorno-geologicheskaja akademija. Ekaterinburg, 41.
  10. Aralbaev, T. Z. (2004). Metody i sredstva postroenija adaptivnyh sistem monitoringa i diagnostirovanija slozhnyh promyshlennyh ob’ektov. Orenburgskij gosudarstvennіj universitet. Orenburg, 32.