FINDING THE PROJECT INITIALIZATION TIME ON MACHINERY PRODUCTION FACTORY

Authors

  • Андрей Юрьевич Москалюк Odessa National Polytechnic University Shevchenko Avenue, 1, Odessa, Ukraine, 65086, Ukraine
  • Павел Александрович Тесленко Odessa State Academy of Civil Engineering and Architecture str. Didrikhsona, 4, Odessa, Ukraine, 65029, Ukraine
  • Валентина Николаевна Пурич Odessa National Polytechnic University Shevchenko Avenue, 1, Odessa, Ukraine, Ukraine

DOI:

https://doi.org/10.15587/1729-4061.2013.6617

Keywords:

a labour safety, project initialization, algorithm of Mamdani

Abstract

The method of estimation of the state of machine-building enterprise is offered on questions of labour protection with the use of theory of fuzzy sets. Selected and analysed basic groups of parameters determining a level labour protections.

A linguistic variable is certain «the beginning of initiation of project». The approach as been developed for forming of data base of machine-building enterprise for the system of support of making decision on initiation of projects of a labour protection.

It is suggested to use the method of Mamdani for forming of unclear conclusion about the necessity of initiation of projects on a labour protection. There  has been given an example illustrating the method of receipt of quantitative estimation of the state of labour protection. The offered method is basis of the decision-making systems in control system by a labour for determination of beginning of initiation of project on a labour protection.

Author Biographies

Андрей Юрьевич Москалюк, Odessa National Polytechnic University Shevchenko Avenue, 1, Odessa, Ukraine, 65086

Senior Lecturer

Department of life-protecting systems management

 

Павел Александрович Тесленко, Odessa State Academy of Civil Engineering and Architecture str. Didrikhsona, 4, Odessa, Ukraine, 65029

PhD, Associate Professor

Department of Management and Project Management

Валентина Николаевна Пурич, Odessa National Polytechnic University Shevchenko Avenue, 1, Odessa, Ukraine

PhD, Associate Professor

Department of life-protecting systems management

References

  1. A Guide to the Project Management Body of Knowledge. Third Edition Guide). An American National Standard ANSI / PMI 99 – 001–2004. – (PMBoK 388 с.
  2. Москалюк, А.Ю. Проектизация процессив охраны труда / А.Ю. Москалюк, П.А. Тесленко // Тези доповідей VII міжнародної науково-практичної конференції «Управління проектами: стан та перспктиви» // Відповідальний за випуск К.В. Кошкін. — К.: НУК, 2011. – С. 208 — 210.
  3. Москалюк, А.Ю. Выбор значимых параметров в задачах инициации проектов по охране труда / Москалюк А.Ю., П.А. Тесленко //Тези доповідей IX міжнародної конференції «Управління проектами у розвитку суспільства» // Відповідальний за випуск С.Д. Бушуєв. — К.: КНУБА, 2012. – С. 188 — 189.
  4. Заде, Л. Понятие лингвистической переменной и его применение к принятию приближенных решений. М.: МИР, 1976. 165 с.

Published

2013-02-10

How to Cite

Москалюк, А. Ю., Тесленко, П. А., & Пурич, В. Н. (2013). FINDING THE PROJECT INITIALIZATION TIME ON MACHINERY PRODUCTION FACTORY. Eastern-European Journal of Enterprise Technologies, 1(10(61), 209–212. https://doi.org/10.15587/1729-4061.2013.6617

Issue

Section

Integrated strategic management, project management and software development companies and territorial