Improving the processes of cost management in the construction and energy projects

Authors

  • Vladimir Babaev O. M. Beketov National University of urban economy in Kharkiv Revolucii str., 12, Kharkov, Ukraine, 61001, Ukraine https://orcid.org/0000-0002-4638-5263
  • Maria Sukhonos O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002, Ukraine https://orcid.org/0000-0002-7246-8740
  • Alona Starostina O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002, Ukraine https://orcid.org/0000-0002-4923-0320
  • Igor Beletsky O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002, Ukraine

DOI:

https://doi.org/10.15587/1729-4061.2016.75515

Keywords:

cost planning method, procedure of reduction, construction and energy projects, resources, long-term timeframe

Abstract

The processes of the cost management of construction-energy projects were improved by expanding the existing set of tools of project management by the method of planning the cost of construction-energy projects. The basis for developing the method is a hypothesis about specific features of the given projects being their structural complexity, significant resource intensity and duration, as well as a large number of stakeholders. This leads to a change in the costs of resources in the period of implementation of the project, and consequently, creates deviations towards its increase over its planned budget. These deviations can be forecasted and considered by using the developed method of planning the cost of construction- energy projects. This method, in contrast to the existing ones, is based on the theory of changeability in the costs of resources over time and it also considers investment and time constraints of the project.

A verification of the proposed method was conducted, it was revealed that its results are more realistic, i.e., they are more in line with the actual data than the results, obtained by application of classical methods of planning the cost of projects. 

The developed method of planning the cost of construction-energy projects can be used for the projects in different directions provided they are long-term and expensive resources comprise a considerable share of their budget. 

Author Biographies

Vladimir Babaev, O. M. Beketov National University of urban economy in Kharkiv Revolucii str., 12, Kharkov, Ukraine, 61001

Doctor in Public Administration, Professor, rector

Department of project management in municipal services and building 

Maria Sukhonos, O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002

Doctor of technical sciences, Associate Professor, Vice-Rector on scientific work

Department of project management in municipal services and building

Alona Starostina, O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002

PhD, head of the research center

Department of project management in municipal services and building

Igor Beletsky, O. M. Beketov National University of urban economy in Kharkiv Marshal Bazhanov str., 17, Kharkiv, Ukraine, 61002

PhD, аssistant

Department of project management in municipal services and building

References

  1. Averbakh, L. I. (1969). Sovershenstvovanie sistemy upravleniya stroitelnoj organizaciej s ispolzovaniem ekonomiko-matematicheskikh metodov. Novosibirsk, 24.
  2. Burkov, V. N., Burkova, I. V. (2010). Metod setevogo programmirovaniya v zadachakh upravleniya proektami. Upravlenie bol'shimi sistemami, 30-1, 40–61. Available at: http://cyberleninka.ru/article/n/metod-setevogo-programmirovaniya-v-zadachah-upravleniya-proektami
  3. Mazur, I. I. (2011). Upravlenie investicionno-stroitel'nymi proektami: mezhdunarodnyj podkhod. Мoscow: Omega-L, 736.
  4. Golubyatnikov, V. T. (2013). Ocenka proizvodstvenno-ekonomicheskoj ustojchivosti investicionno-stroitel'nogo proekta v processe ego realizacii. Upravlіnnya proektami ta rozvitok virobnictva. Lugansk: Vyd-vo SNU im. V. Dalja, 2 (46), 17–24.
  5. Rukovodstvo k Svodu znanij po upravleniyu proektami (Rukovodstvo PMBOK®) (2013). Pyatoe izdanie. Newtown square, PA, USA: Project Management Institute, Inc, 614.
  6. Babaev, V., Sukhonos, M., Beletsky, I. (2014). Classification of high-tech construction and energy projects. Municipal economy of cities, 118, 49–51.
  7. Ahadzie, D. K., Proverbs, D. G., Sarkodie-Poku, I. (2014). Competencies required of project managers at the design phase of mass house building projects. International Journal of Project Management, 32 (6), 958–969. doi: 10.1016/j.ijproman.2013.10.015
  8. Siami-Irdemoosa, E., Dindarloo, S. R., Sharifzadeh, M. (2015). Work breakdown structure (WBS) development for underground construction. Automation in Construction, 58, 85–94. doi: 10.1016/j.autcon.2015.07.016
  9. Heravi, A., Coffey, V., Trigunarsyah, B. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management, 33 (5), 985–997. doi: 10.1016/j.ijproman.2014.12.007
  10. Alzraiee, H., Zayed, T., Moselhi, O. (2015). Dynamic planning of construction activities using hybrid simulation. Automation in Construction, 49, 176–192. doi: 10.1016/j.autcon.2014.08.011
  11. Ochoa, J. J. (2014). Reducing plan variations in delivering sustainable building projects. Journal of Cleaner Production, 85, 276–288. doi: 10.1016/j.jclepro.2014.01.024
  12. Purnus, A., Bodea, C.-N. (2014). Correlation between Time and Cost in a Quantitative Risk Analysis of Construction Projects. Procedia Engineering, 85, 436–445. doi: 10.1016/j.proeng.2014.10.570
  13. Barkalov, S. A., Burkov, V. N., Gilyazov, N. M. (1999). Metody agregirovaniya v upravlenii proyektami. Moscow: IPU RAN, 55.
  14. Breyli, R., Mayyers, S. (2008). Printsipy korporativnykh finansov. Moscow: ZAO «Olimp-Biznes», 1008.
  15. Makkonell, K. R., Bryu, S. L. (1999). Ekonomiks: printsipy, problemy i politika. Moscow: INFRA-M, ХХХIV, 974.

Downloads

Published

2016-08-31

How to Cite

Babaev, V., Sukhonos, M., Starostina, A., & Beletsky, I. (2016). Improving the processes of cost management in the construction and energy projects. Eastern-European Journal of Enterprise Technologies, 4(3(82), 10–17. https://doi.org/10.15587/1729-4061.2016.75515

Issue

Section

Control processes