Determining the influence of transformation changes in the life cycle on the assessment of effectiveness of an ecologistic system project
DOI:
https://doi.org/10.15587/1729-4061.2021.225262Keywords:
ecologistic system, project, life cycle, cash flows, discounted payback periodAbstract
The issue of assessing the effectiveness of a project of an ecologistic system using the criterion of «a discounted payback period», which takes into consideration the transformational changes in the project life cycle, was considered.
The specific features of the life cycle of a project of an ecologistic system, in the structure of which it is proposed to include environmentally-oriented regeneration and revitalization phases, were explored. The phases of a life cycle were divided into stages, between which consecutive and parallel relations were established. The project life cycle consists of time intervals, during which from one to three stages of the project phases can run in parallel. A model of the life cycle of an ecologistic system, which shows the relations between time intervals and cash flows that correspond to the stages of the project life cycle phases, was developed. A mathematical formula for calculating the discounted payback period of a project, which takes into consideration the specific features of the formation of cash flows of separate phases of the life cycle of an ecologistic system, was proposed. The application of the formula is possible when assuming the constancy of cash flows of the stages of operational and the regeneration phases, which corresponds to the conditions of uncertainty of their forecasting at the beginning of the project. The functional dependences between the discounted payback period and cash flows during the phases of a project life cycle were studied.
Depending on a phase of the life cycle, the dependence is expressed by a linear, polynomial, or power function. The identification of functional dependences makes it possible to study the dynamics of changes in the discounted payback period with changes in project cash flows, which can be used in forecasting the effectiveness of an ecologistic system project.
References
- Programma deystviy. Povestka dnya na XXI vek i drugie dokumenty Konferentsii v Rio-de-Zhaneyro v populyarnom izlozhenii (1993). Zheneva: Tsentr «Za nashe obshchee budushchee», 70.
- Kovtun, T. (2020). Determining the role of ecologization in achieving the goals of sustainable development. Development of Management and Entrepreneurship Methods on Transport (ONMU), 2 (71), 63–81. doi: https://doi.org/10.31375/2226-1915-2020-2-63-81
- Mishenin, Ye. V., Koblianska, I. I., Ustik, T. V., Yarova, I. Ye. (2013). Ekolohoorientovane lohistychne upravlinnia vyrobnytstvom. Sumy: TOV «Drukarskyi dim «Papirus», 248.
- Van Buren, N., Demmers, M., van der Heijden, R., Witlox, F. (2016). Towards a Circular Economy: The Role of Dutch Logistics Industries and Governments. Sustainability, 8 (7), 647. doi: https://doi.org/10.3390/su8070647
- Rudenko, S. V., Kovtun, T. A. (2020). Greening of logistics as a direction of realization of the concept of sustainable development. Project and logistics management: new knowledge based on two methodologies. Vol. 3. Odessa, 7–24.
- Potting, J., Hekkert, M., Worrell, E., Hanemaaijer, A. (2017). Circular Economy: Measuring Innovation in the Product Chain. Netherlands Environmental Assessment Agency, 46. Available at: https://www.pbl.nl/sites/default/files/downloads/pbl-2016-circular-economy-measuring-innovation-in-product-chains-2544.pdf
- Ghisellini, P., Cialani, C., Ulgiati, S. (2016). A review on circular economy: the expected transition to a balanced interplay of environmental and economic systems. Journal of Cleaner Production, 114, 11–32. doi: https://doi.org/10.1016/j.jclepro.2015.09.007
- Towards a Circular Economy: Business Rationale For An Accelerated Transition (2015). Ellen MacArthur Foundation. Available at: https://www.ellenmacarthurfoundation.org/assets/downloads/TCE_Ellen-MacArthur-Foundation-9-Dec-2015.pdf
- Kovtun, T. (2020). A model of closed circuits forming in a logistics system with feedback. Innovative Technologies and Scientific Solutions for Industries, 4 (14), 113–120. doi: https://doi.org/10.30837/itssi.2020.14.113
- Kosenko, V., Gopejenko, V., Persiyanova, E. (2019). Models and applied information technology for supply logistics in the context of demand swings. Innovative Technologies and Scientific Solutions for Industries, 1 (7), 59–68. doi: https://doi.org/10.30837/2522-9818.2019.7.059
- Bukrinskaya, E. M., Miasnikova, L. A. (2018). Participants in the system of waste management: logistics of interaction (Russia, St. Petersburg). Problems of Modern Economics, 3 (67), 152–157. Available at: https://cyberleninka.ru/article/n/logistika-vzaimodeystviya-uchastnikov-sistemy-obrascheniya-s-othodami
- Dziubina, K. O. (2011). Mistse zvorotnoho materialnoho potoku v vyrobnycho-hospodarskiy diyalnosti pidpryiemstva. Herald of the Dnepropetrovsk National University. Series: Economics, 5/4, 163–171. Available at: http://vestnikdnu.com.ua/201154.php
- Project Management Body of Knowledge (PMBOK® Guide) (2017). Project Management Institute, Inc., 574.
- Beg'yuli, F. (2002). Upravlenie proektom. Moscow: FAIR-PRESS, 208.
- Rach, V. A., Antonenko, S. V., Cherepaha, G. S. (2004). Peculiarities of project manager and team cooperation on different project stages. Project management and development of production, 1 (9), 160–170. Available at: http://www.pmdp.org.ua/index.php/en/component/content/article/71-2004/9/917-rach-antonenko-cherepakha
- GOST R ISO 14044-2019. Environmental management. Life cycle assessment. Requirements and guidelines. Available at: http://docs.cntd.ru/document/1200167821
- GOST R ISO 14004-2017. Environmental management systems. General guidelines on implementation. Available at: http://docs.cntd.ru/document/1200146250
- The GPM P5 Standard for Sustainability in Project Management v2.0. GPM Global. Available at: https://www.greenprojectmanagement.org/the-p5-standard
- Piterska, V., Kolesnikov, O., Lukianov, D., Kolesnikova, K., Gogunskii, V., Olekh, T. et. al. (2018). Development of the Markovian model for the life cycle of a project’s benefits. Eastern-European Journal of Enterprise Technologies, 5 (4 (95)), 30–39. doi: https://doi.org/10.15587/1729-4061.2018.145252
- Onishchenko, S. P. (2009). Optimizatsiya obektnyh i vremennyh parametrov ekspluatatsionnoy fazy proektov razvitiya predpriyatiy na primere sudohodnyh kompaniy. Metody ta zasoby rozvytku transportnykh system, 15, 70‒84.
- Bernevek, T. I., Bernevek, T. I. (2018). Obosnovanie obektnyh i vremennyh parametrov proektov popolneniya flota. Visnyk ONMU, 1 (54), 175‒186.
- Onyshсhenko S., Arabadji, O. (2016). Creation of time management methods in the planning of execution for company development programs. Technology Audit and Production Reserves, 2 (3 (28)), 7‒12. doi: https://doi.org/10.15587/2312-8372.2016.66674
- Ahsan, K., Gunawan, I. (2010). Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28 (1), 68–78. doi: https://doi.org/10.1016/j.ijproman.2009.03.005
- Herroelen, W., Leus, R. (2004). Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42 (8), 1599–1620. doi: https://doi.org/10.1080/00207540310001638055
- Hyari, K., El-Rayes, K. (2006). Optimal Planning and Scheduling for Repetitive Construction Projects. Journal of Management in Engineering, 22 (1), 11–19. doi: https://doi.org/10.1061/(asce)0742-597x(2006)22:1(11)
- Chang, C. K., Jiang, H., Di, Y., Zhu, D., Ge, Y. (2008). Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology, 50 (11), 1142–1154. doi: https://doi.org/10.1016/j.infsof.2008.03.002
- Artigues, C., Michelon, P., Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research, 149 (2), 249–267. doi: https://doi.org/10.1016/s0377-2217(02)00758-0
- Cheng, M.-Y., Tran, D.-H., Wu, Y.-W. (2014). Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems. Automation in Construction, 37, 88–97. doi: https://doi.org/10.1016/j.autcon.2013.10.002
- Baradaran, S., Fatemi Ghomi, S. M. T., Mobini, M., Hashemin, S. S. (2010). A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks. Advances in Engineering Software, 41 (7-8), 966–975. doi: https://doi.org/10.1016/j.advengsoft.2010.05.010
- Cheng, M.-Y., Tran, D.-H. (2014). Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects. IEEE Transactions on Engineering Management, 61 (3), 450–461. doi: https://doi.org/10.1109/tem.2014.2327512
- Kovtun, T., Smrkovska, V. (2020). Development of a cash flow model for the eco-logistics system project. Technology Audit and Production Reserves, 6 (2 (56)), 26–33. doi: https://doi.org/10.15587/2706-5448.2020.220964
- Boldyreva, T. V., Kovtun, T. A. (2007). Metodicheskiy podhod k initsializatsii parametrov produktov proekta transportnogo predpriyatiya. Visnyk Odeskoho natsionalnoho morskoho universytetu, 22, 166–180
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Сергей Васильевич Руденкo, Виктoр Дмитриевич Гoгунский, Татьяна Антoнoвна Кoвтун, Виктoрия Юрьевна Смркoвская
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.
A license agreement is a document in which the author warrants that he/she owns all copyright for the work (manuscript, article, etc.).
The authors, signing the License Agreement with TECHNOLOGY CENTER PC, have all rights to the further use of their work, provided that they link to our edition in which the work was published.
According to the terms of the License Agreement, the Publisher TECHNOLOGY CENTER PC does not take away your copyrights and receives permission from the authors to use and dissemination of the publication through the world's scientific resources (own electronic resources, scientometric databases, repositories, libraries, etc.).
In the absence of a signed License Agreement or in the absence of this agreement of identifiers allowing to identify the identity of the author, the editors have no right to work with the manuscript.
It is important to remember that there is another type of agreement between authors and publishers – when copyright is transferred from the authors to the publisher. In this case, the authors lose ownership of their work and may not use it in any way.