Constructing a model for the automated operative planning of local operations at railroad technical stations
DOI:
https://doi.org/10.15587/1729-4061.2021.233673Keywords:
optimization of local operations, technical station, railroad connecting lines, shunting half-run, combinatorial vector optimizationAbstract
This paper has investigated the technology of forwarding local wagons at railroad technical stations and established the need to improve it given the extra downtime of local wagons. The main issue relates to the considerable combinatorial complexity of the tasks of operational planning. Another problem is that as part of the conventional approach, planning a station operation and planning a local operation at it is considered separately. Another planning issue is the lack of high-quality models for the preparation of initial data, in particular, data on the duration of technological operations, such as, for example, shunting operations involving local wagons forwarding. To resolve these issues, a new approach has been proposed, under which the tasks of operative planning of a technical station’s operation and its subsystem of local operations are tackled simultaneously, based on a single model. To this end, a mathematical model of vector combinatoric optimization has been built, which uses the criteria of total operating costs and wagon-hours spent at a station when forwarding local wagon flows, in the form of separate objective functions. Within this model, a predictive model was constructed in the form of a fuzzy inference system. This model is designed to determine the duration of shunting half-runs when executing the spotting/picking operations for delivering local wagons to enterprises’ goods sheds. The model provides for the accuracy level that would suffice at planning, in contrast to classical methods. A procedure has been devised for optimizing the planning model, which employs the modern genetic algorithm of vector optimization NSGA-III. This procedure is implemented in the form of software that makes it possible to build a rational operative plan for the operation of a technical station, including a subsystem of local operations, in graphic form, thereby reducing the operating costs by 5 % and the duration of maintenance of a local wagon by 8 %. The resulting effect could reduce the turnover time of a freight car in general on the railroad network, speed up the delivery of goods, and reduce the cost of transportation
References
- Bielli, M., Bielli, A., Rossi, R. (2011). Trends in Models and Algorithms for Fleet Management. Procedia - Social and Behavioral Sciences, 20, 4–18. doi: https://doi.org/10.1016/j.sbspro.2011.08.004
- Halldórsson, Á., Wehner, J. (2020). Last-mile logistics fulfilment: A framework for energy efficiency. Research in Transportation Business & Management, 37, 100481. doi: https://doi.org/10.1016/j.rtbm.2020.100481
- Mira, L., Andrade, A. R., Gomes, M. C. (2020). Maintenance scheduling within rolling stock planning in railway operations under uncertain maintenance durations. Journal of Rail Transport Planning & Management, 14, 100177. doi: https://doi.org/10.1016/j.jrtpm.2020.100177
- Butko, T., Prokhorov, V., Kalashnikova, T., Riabushka, Y. (2019). Organization of railway freight short-haul transportation on the basis of logistic approaches. Procedia Computer Science, 149, 102–109. doi: https://doi.org/10.1016/j.procs.2019.01.113
- Lin, B., Zhao, Y., Lin, R., Liu, C. (2021). Integrating traffic routing optimization and train formation plan using simulated annealing algorithm. Applied Mathematical Modelling, 93, 811–830. doi: https://doi.org/10.1016/j.apm.2020.12.031
- Bruck, B. P., Cordeau, J.-F., Frejinger, E. (2021). Integrated inbound train split and load planning in an intermodal railway terminal. Transportation Research Part B: Methodological, 145, 270–289. doi: https://doi.org/10.1016/j.trb.2021.01.006
- Shi, T., Zhou, X. (2015). A mixed integer programming model for optimizing multi-level operations process in railroad yards. Transportation Research Part B: Methodological, 80, 19–39. doi: https://doi.org/10.1016/j.trb.2015.06.007
- Gestrelius, S., Aronsson, M., Joborn, M., Bohlin, M. (2017). Towards a comprehensive model for track allocation and roll-time scheduling at marshalling yards. Journal of Rail Transport Planning & Management, 7 (3), 157–170. doi: https://doi.org/10.1016/j.jrtpm.2017.06.002
- Kozachenko, D. M. (2013). Mathematical model for estimating of technical and technological indicators of railway stations operation. Science and Transport Progress. Bulletin of Dnipropetrovsk National University of Railway Transport, 3 (45), 22–28. doi: https://doi.org/10.15802/stp2013/14540
- Panchenko, A., Prokhorchenko, A., Panchenko, S., Dekarchuk, O., Gurin, D., Medvediev, I. (2020). Predicting the estimated time of cargo dispatch from a marshaling yard. Eastern-European Journal of Enterprise Technologies, 4 (3 (106)), 6–15. doi: https://doi.org/10.15587/1729-4061.2020.209912
- Borwein, J. M. (1980). The geometry of Pareto efficiency over cones. Mathematische Operationsforschung Und Statistik. Series Optimization, 11 (2), 235–248. doi: https://doi.org/10.1080/02331938008842650
- Campos Ciro, G., Dugardin, F., Yalaoui, F., Kelly, R. (2016). A NSGA-II and NSGA-III comparison for solving an open shop scheduling problem with resource constraints. IFAC-PapersOnLine, 49 (12), 1272–1277. doi: https://doi.org/10.1016/j.ifacol.2016.07.690
- Ferreira, J. C., Fonseca, C. M., Gaspar-Cunha, A. (2007). Methodology to select solutions from the pareto-optimal set. Proceedings of the 9th Annual Conference on Genetic and Evolutionary Computation - GECCO ’07. doi: https://doi.org/10.1145/1276958.1277117
- Guo, R., Guo, J., Xie, G. (2016). Optimizing model of a railroad yard’s operations plan based on production scheduling theory. Computers in Railways XV: Railway Engineering Design and Operation. doi: https://doi.org/10.2495/cr160081
- Van den Broek, R., Hoogeveen, H., Van den Akker, M. (2018). How to measure the robustness of shunting plans. 18th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS 2018), 65, 3:1–3:13. doi: https://doi.org/10.4230/OASIcs.ATMOS.2018.3
- Metodychni vkazivky z rozrakhunku norm chasu na manevrovi roboty, yaki vikonuiutsia na zaliznichnomu transporti. Zatv.: Nakaz Ukrzaliznytsi 25.03.03 No. 72-TsZ (2003). Kyiv, 82.
- Lashenyh, O., Turpak, S., Gritcay, S., Vasileva, L., Ostroglyad, E. (2016). Development of mathematical models for planning the duration of shunting operations. Eastern-European Journal of Enterprise Technologies, 5 (3 (83)), 40–46. doi: https://doi.org/10.15587/1729-4061.2016.80752
- Gruntov, P. S., D'yakov, Yu. V., Makarochkin, A. M. et. al. (1994). Upravlenie ekspluatatsionnoy rabotoy i kachestvom perevozok na zheleznodorozhnom transporte. Moscow: Transport, 543.
- McKenzie, J. (2011). Mean absolute percentage error and bias in economic forecasting. Economics Letters, 113 (3), 259–262. doi: https://doi.org/10.1016/j.econlet.2011.08.010
- Mamdani, E. H., Assilian, S. (1975). An experiment in linguistic synthesis with a fuzzy logic controller. International Journal of Man-Machine Studies, 7 (1), 1–13. doi: https://doi.org/10.1016/s0020-7373(75)80002-2
- Peresta, H. I., Bolvanovska, T. V. (2011). Analysis of the impact of components on the value of turnover of freight cars. Transport systems and transportation technologies, 1, 75–77. Available at: http://tstt.diit.edu.ua/article/view/17170/14830
- Dolecki, S., Malivert, C. (1993). General duality in vector optimization. Optimization, 27 (1-2), 97–119. doi: https://doi.org/10.1080/02331939308843875
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Артём Алексеевич Прокопов, Виктор Николаевич Прохоров, Татьяна Юрьевна Калашникова, Татьяна Владиславна Головко, Анна Евгеньевна Богомазова
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.
A license agreement is a document in which the author warrants that he/she owns all copyright for the work (manuscript, article, etc.).
The authors, signing the License Agreement with TECHNOLOGY CENTER PC, have all rights to the further use of their work, provided that they link to our edition in which the work was published.
According to the terms of the License Agreement, the Publisher TECHNOLOGY CENTER PC does not take away your copyrights and receives permission from the authors to use and dissemination of the publication through the world's scientific resources (own electronic resources, scientometric databases, repositories, libraries, etc.).
In the absence of a signed License Agreement or in the absence of this agreement of identifiers allowing to identify the identity of the author, the editors have no right to work with the manuscript.
It is important to remember that there is another type of agreement between authors and publishers – when copyright is transferred from the authors to the publisher. In this case, the authors lose ownership of their work and may not use it in any way.