Detection cycle processes affect to the project implementation

Authors

  • Владимир Федорович Литвинов Odessa National Polytechnic University Shevchenko avenue 1-3, Odessa, Ukraine, 65 044, Ukraine

DOI:

https://doi.org/10.15587/1729-4061.2012.3642

Keywords:

Cycle processes, process, project

Abstract

The way to identify the frequency of the external and internal factors affecting the success of projects are proposed. The most likely prediction can be obtained by the method of maximum entropy

Author Biography

Владимир Федорович Литвинов, Odessa National Polytechnic University Shevchenko avenue 1-3, Odessa, Ukraine, 65 044

Ph.D. in Physics and Mathematics Sciences, Associate Professor

Department of Systems Management Life Safety

References

  1. Бушуев С.Д., Бушуева Н.С. Управление проектами. Киев. Иридиум, 2006, 208с. Илл
  2. Penland, C., Ghil, M., and Weickmann, K., 1991: Adaptive filtering and maximum entropy spectra with application to changes in atmospheric angular momentum: J. Geophys. Res., 96, 22659-22671.
  3. . Кравчук В.К. Новый адаптивный метод следования за тенденцией и рыночными циклами. Валютный спекулянт, № 12, декабрь 2000,с. 50–55.
  4. А. С. Васюра, И. В. Васильев .Модель экспертной системы принятия решений на финансовых временных рядах. Наукові праці ВНТУ, 2009, № 4 c. 1-10

Published

2012-02-01

How to Cite

Литвинов, В. Ф. (2012). Detection cycle processes affect to the project implementation. Eastern-European Journal of Enterprise Technologies, 1(13(55), 25–27. https://doi.org/10.15587/1729-4061.2012.3642

Issue

Section

Integrated strategic management, project management and software development companies and territorial