The studies we conducted address the subject of setting the standards of shunting operations in rail transport. Existing methods of standardization of shunting operations in rail transport are analyzed and their deficiencies are revealed. A mathematical model of technological time of the transposition of shunting train sets was built. We developed regression models of technological time for the semi-flights of the rounds of shunting locomotives for a train set and their transpositions at different speeds of shunting operations. Based on the analysis of tabular norms of duration of the execution of shunting operations, we proposed to use polynomial models as more convenient in practical application and reflecting the influence on the value of technological time not only from separate variables (factors) but their interaction as well. As a result of a full factor experiment with effects of pair interaction, the model is obtained of technological time of the transposition of shunting train sets, which adequately reflects the element of transportation process. We carried out calculations that confirm the adequacy of the developed model. The dependencies that we obtained are more convenient to apply in comparison to the tabular method of representation of the norms of time for the operations, it is recommended to use them when constructing simulation models of operation of the railway stations.

Author Biographies

Olexandr Lashenyh, Zaporozhye National Technical University Zhukovsky str., 64, Zaporozhye, Ukraine, 69093

PhD, Associate professor

Department of Transport Technology

Serhii Turpak, Zaporozhye National Technical University Zhukovsky str., 64, Zaporozhye, Ukraine, 69093

Doctor of Technical Science, Associate professor

Department of Transport Technology

Sergey Gritcay, Zaporozhye National Technical University Zhukovsky str., 64, Zaporozhye, Ukraine, 69093

Senior Lecturer

Department of Transport Technology

Larysa Vasileva, Zaporozhye National Technical University Zhukovsky str., 64, Zaporozhye, Ukraine, 69093

Senior Lecturer

Department of Transport Technology

Elena Ostroglyad, Zaporozhye National Technical University Zhukovsky str., 64, Zaporozhye, Ukraine, 69093

Postgraduate student

Department of Transport Technology

References

  1. Kovalev, V. I., Os'minin, A. T. (2009). Upravlenie ehkspluatacionnoj rabotoj na zheleznodorozhnom transporte. Moscow: GOU «Uchebno-metodicheskij centr po obrazovaniyu na zheleznodorozhnom transporte», 263.
  2. Metodicheskie ukazaniya po raschetu norm vremeni na manevrovye raboty, vypolnyaemye na zheleznodorozhnom transporte (1998). Utverzhdeny CZ MPS RF 19.03.1998. Moscow: Min. putej soobshcheniya RF, 84.
  3. Pepevnik, A. (2003). Model of shunting technology based on system structure. Promet (Zagreb), 15 (5), 291–297.
  4. Shmulevich, M. I., Starikov, A. E. (2015). Osobennosti normirovaniya manevrovoj raboty v imitacionnoj modeli stancii. Mir transporta, 13 (5 (60)), 198–212.
  5. Ivic, M., Markovic, M., Markovic, A. (2007). Effects of the application of conventional methods in the process of forming the pick-up trains. Yugoslav Journal of Operations Research, 17 (2), 245–256. doi: 10.2298/yjor0702245i
  6. Pepevnik, A., Bogovic, B. (2003). The railway traffic shunting system. Promet (Zagreb), 15 (3), 177–184.
  7. Pepevnik, A., Belsak, M. (2011). Information system in the function of railway traffic management. Transport problems. International scientific journal, 6 (1), 37–42.
  8. Boysen, N., Fliedner, M., Jaehn, F., Pesch, E. (2012). Shunting yard operations: Theoretical aspects and applications. European Journal of Operational Research, 220 (1), 1–14. doi: 10.1016/j.ejor.2012.01.043
  9. Korop, G. V. (2013). Razrabotka programmnogo kompleksa po planirovaniyu i normirovaniyu manevrovoj raboty. Vestnik VNU im. V. Dalya, 4 (193), Part 2. 60–64.
  10. Normy vremeni na manevrovye raboty, vypolnyaemye na zheleznodorozhnyh stanciyah OAO "RZHD", normativy chislennosti brigad manevrovyh lokomotivov (2007). Utv. OAO "RZHD" 08.02.2007. Moscow: Tekhinform, 100.
  11. Smorodinceva, E. E., Timuhina, E. N. (2009). Tekhnologiya i organizaciya pererabotki vagonopotokov na sortirovochnoj stancii. Ekaterinburg: UrGUPS, 68.
  12. Lashchenykh, O. A., Kuz'kin, O. F., Hrytsay, S. V. (2012). Imovirnisni i statystyko-eksperymental'ni metody analizu transportnykh protsesiv i system. Zaporizhzhya: ZNTU, 420.
  13. Barabashchuk, V. I., Kredencer, B. P., Miroshnichenko, V. I. (1984). Planirovanie ehksperimenta v tekhnike. Kyiv: Tekhnіka, 198.
  14. Mohanad, M. K., Kostyk, V., Domin, D., Kostyk, K. (2016). Modeling of the case depth and surface hardness of steel during ion nitriding. Eastern-European Journal of Enterprise Technologies, 2 (5 (80)), 45–49. doi: 10.15587/1729-4061.2016.65454
  15. Domin, D. (2013). Adaptive modeling in problems of optimal control search termovremennoy cast iron. Eastern-European Journal of Enterprise Technologies, 6 (4 (66)), 31–37. Available at: http://journals.uran.ua/eejet/article/view/19453/17110
  16. Kuryn, M. G. (2012). Synthesis of cold-hardening mixtures with given set of properties and optimization of technological regimes of their manufacturing [Text]. Technology audit and production reserves, 1 (1 (3)), 25–29. Available at: http://journals.uran.ua/tarp/article/view/4872/4523