Saati’s method, risk management, failure probability, maintenance and repairAbstract
The research is devoted to the development of a model for cost distribution of maintenance and repair of electrical equipment when making decisions on the management of the electric power system state. The decrease in the reliability of electric power system operation, caused by the objectively existing aging of electrical equipment, requires consideration of equipment significance when planning the maintenance and repair. For this purpose, it is proposed to use the theory of fuzzy sets, Saati’s method and Boolean programming method. The result of solving the optimization problem of multicriteria analysis is a vector of the best alternatives, built on the principle of dominance. The developed algorithm of complex simulation of the electric power system state and cost distribution of maintenance and repair for making decisions on the determination of priority of electrical equipment out of service allows for effective decisionmaking. The results of probabilistic and statistical simulation of electric power system states using the Monte Carlo method allow us to take into account the probabilistic nature of emergency situations in the electric power system when determining its weakest elements that require priority replacement. The advantage of the proposed approach is taking into account the technical condition of electrical equipment for risk assessment of the electric power system emergency situation. A comparative analysis of ranking results of electrical equipment based on the emergency risk assessment of the electric power system confirmed the high efficiency of the planning of electric power system states when solving the problems of preventive control. The developed model will be used for further research and development of the algorithm for making effective decisions regarding the operation strategy of the electrical equipment and preventive control of the subsystem operation of the electric power system. The obtained results of complex simulation of the electric power system state and technical condition of the electrical equipment give grounds to assert the possibility of software implementation of operation risk analysis of the electric power system for power supply companiesReferences
- Dahai You, A., QingQian Chen, B., Xianggen Yin, C., Bo Wang, D. (2011). A study of Electrical Security Risk Assessment System based on Electricity Regulation. Energy Policy, 39 (4), 2062–2074. doi: https://doi.org/10.1016/j.enpol.2011.01.050
- Wallnerstrom, C. J., Hilber, P. (2012). Vulnerability Analysis of Power Distribution Systems for Cost-Effective Resource Allocation. IEEE Transactions on Power Systems, 27 (1), 224–232. doi: https://doi.org/10.1109/tpwrs.2011.2165226
- Hilber, P., Babu, S., Wallnerstom, J., Westerlund, P., Rosenlind, J. (2013). Benefits of reliability centred asset management. 22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013). doi: https://doi.org/10.1049/cp.2013.0668
- Ciapessoni, E., Cirio, D., Gagleoti, E. (2008). A probabilistic approach for operational risk assessment of power systems. CIGRE, C4–114.
- Shiwen, Y., Hui, H., Chengzhi, W., Hao, G., Hao, F. (2017). Review on Risk Assessment of Power System. Procedia Computer Science, 109, 1200–1205. doi: https://doi.org/10.1016/j.procs.2017.05.399
- Louit, D., Pascual, R., Banjevic, D. (2009). Optimal interval for major maintenance actions in electricity distribution networks. International Journal of Electrical Power & Energy Systems, 31 (7-8), 396–401. doi: https://doi.org/10.1016/j.ijepes.2009.03.021
- Moradkhani, A., Haghifam, M. R., Abedi, S. M. (2015). Risk-based maintenance scheduling in the presence of reward penalty scheme. Electric Power Systems Research, 121, 126–133. doi: https://doi.org/10.1016/j.epsr.2014.12.006
- Xiao, N., Huang, H.-Z., Li, Y., He, L., Jin, T. (2011). Multiple failure modes analysis and weighted risk priority number evaluation in FMEA. Engineering Failure Analysis, 18 (4), 1162–1170. doi: https://doi.org/10.1016/j.engfailanal.2011.02.004
- Yssaad, B., Khiat, M., Chaker, A. (2014). Reliability centered maintenance optimization for power distribution systems. International Journal of Electrical Power & Energy Systems, 55, 108–115. doi: https://doi.org/10.1016/j.ijepes.2013.08.025
- Leite da Silva, A. M., Rezende, L. S., Manso, L. A. F., Anders, G. J. (2010). Transmission expansion planning: A discussion on reliability and “N−1” security criteria. 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems. doi: https://doi.org/10.1109/pmaps.2010.5528652
- Handschin, E., Jurgens, I., Neumann, C. (2008). Long term optimization for risk oriented asset management. 16th Power Systems Computation Conference. Glasgow.
- Goerdin, S. A. V., Smit, J. J., Mehairjan, R. P. Y. (2015). Monte Carlo simulation applied to support risk-based decision making in electricity distribution networks. 2015 IEEE Eindhoven PowerTech. doi: https://doi.org/10.1109/ptc.2015.7232494
- Wang, B., Li, Y., Watada, J. (2011). A New MOPSO to Solve a Multi-Objective Portfolio Selection Model with Fuzzy Value-at-Risk. Lecture Notes in Computer Science, 217–226. doi: https://doi.org/10.1007/978-3-642-23854-3_23
- Bardyk, Ye. I. (2014). Modelling and assessment of chances of failure of power systems electrical equipment taking into account the after repair resource restoration level. Visnyk of National Mining University, 3, 82–90.
- Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1 (1), 83–98. doi: https://doi.org/10.1504/ijssci.2008.017590
- Kosterev, N. V., Bardyk, E. I., Litvinov, V. V. (2015). Preventive risk-management of power system for its reliability increasing. WSEAS TRANSACTIONS on POWER SYSTEMS, 251–258.
- Bardyk, E. I. (2014). Models of reliability assessing of electricity supply of auxiliary NPP from external sources with fuzzy defined parameters of failures of equipments. Proceedings of the Institute of Electrodynamics of National Academy of Sciences of Ukraine, 34–38.
- Bardyk, E., Bolotnyi, N. (2017). Parametric identification of fuzzy model for power transformer based on real operation data. Eastern-European Journal of Enterprise Technologies, 6 (8 (90)), 4–10. doi: https://doi.org/10.15587/1729-4061.2017.118632
- Bardyk, E., Bolotnyi, N. (2018). Development of a model for determining a priority sequence of power transformers out of service. Eastern-European Journal of Enterprise Technologies, 3 (8 (93)), 6–15. doi: https://doi.org/10.15587/1729-4061.2018.133570
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 Eugen Bardyk, Nickolai Bolotnyi
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.
A license agreement is a document in which the author warrants that he/she owns all copyright for the work (manuscript, article, etc.).
The authors, signing the License Agreement with TECHNOLOGY CENTER PC, have all rights to the further use of their work, provided that they link to our edition in which the work was published.
According to the terms of the License Agreement, the Publisher TECHNOLOGY CENTER PC does not take away your copyrights and receives permission from the authors to use and dissemination of the publication through the world's scientific resources (own electronic resources, scientometric databases, repositories, libraries, etc.).
In the absence of a signed License Agreement or in the absence of this agreement of identifiers allowing to identify the identity of the author, the editors have no right to work with the manuscript.
It is important to remember that there is another type of agreement between authors and publishers – when copyright is transferred from the authors to the publisher. In this case, the authors lose ownership of their work and may not use it in any way.