Development of a mathematical model for cost distribution of maintenance and repair of electrical equipment

Authors

DOI:

https://doi.org/10.15587/1729-4061.2018.147622

Keywords:

Saati’s method, risk management, failure probability, maintenance and repair

Abstract

The research is devoted to the development of a model for cost distribution of maintenance and repair of electrical equipment when making decisions on the management of the electric power system state. The decrease in the reliability of electric power system operation, caused by the objectively existing aging of electrical equipment, requires consideration of equipment significance when planning the maintenance and repair. For this purpose, it is proposed to use the theory of fuzzy sets, Saati’s method and Boolean programming method. The result of solving the optimization problem of multicriteria analysis is a vector of the best alternatives, built on the principle of dominance. The developed algorithm of complex simulation of the electric power system state and cost distribution of maintenance and repair for making decisions on the determination of priority of electrical equipment out of service allows for effective decision­making. The results of probabilistic and statistical simulation of electric power system states using the Monte Carlo method allow us to take into account the probabilistic nature of emergency situations in the electric power system when determining its weakest elements that require priority replacement. The advantage of the proposed approach is taking into account the technical condition of electrical equipment for risk assessment of the electric power system emergency situation. A comparative analysis of ranking results of electrical equipment based on the emergency risk assessment of the electric power system confirmed the high efficiency of the planning of electric power system states when solving the problems of preventive control. The developed model will be used for further research and development of the algorithm for making effective decisions regarding the operation strategy of the electrical equipment and preventive control of the subsystem operation of the electric power system. The obtained results of complex simulation of the electric power system state and technical condition of the electrical equipment give grounds to assert the possibility of software implementation of operation risk analysis of the electric power system for power supply companies

Author Biographies

Eugen Bardyk, National Technical University of Ukraine "Igor Sikorsky Kyiv Polytechnic Institute" Peremohy ave., 37, Kyiv, Ukraine, 03056

PhD, Associate Professor, Head of Department

Department of electric power plants

Nickolai Bolotnyi, National Technical University of Ukraine "Igor Sikorsky Kyiv Polytechnic Institute" Peremohy ave., 37, Kyiv, Ukraine, 03056

Postgraduate student

Department of electric power plants

References

  1. Dahai You, A., QingQian Chen, B., Xianggen Yin, C., Bo Wang, D. (2011). A study of Electrical Security Risk Assessment System based on Electricity Regulation. Energy Policy, 39 (4), 2062–2074. doi: https://doi.org/10.1016/j.enpol.2011.01.050
  2. Wallnerstrom, C. J., Hilber, P. (2012). Vulnerability Analysis of Power Distribution Systems for Cost-Effective Resource Allocation. IEEE Transactions on Power Systems, 27 (1), 224–232. doi: https://doi.org/10.1109/tpwrs.2011.2165226
  3. Hilber, P., Babu, S., Wallnerstom, J., Westerlund, P., Rosenlind, J. (2013). Benefits of reliability centred asset management. 22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013). doi: https://doi.org/10.1049/cp.2013.0668
  4. Ciapessoni, E., Cirio, D., Gagleoti, E. (2008). A probabilistic approach for operational risk assessment of power systems. CIGRE, C4–114.
  5. Shiwen, Y., Hui, H., Chengzhi, W., Hao, G., Hao, F. (2017). Review on Risk Assessment of Power System. Procedia Computer Science, 109, 1200–1205. doi: https://doi.org/10.1016/j.procs.2017.05.399
  6. Louit, D., Pascual, R., Banjevic, D. (2009). Optimal interval for major maintenance actions in electricity distribution networks. International Journal of Electrical Power & Energy Systems, 31 (7-8), 396–401. doi: https://doi.org/10.1016/j.ijepes.2009.03.021
  7. Moradkhani, A., Haghifam, M. R., Abedi, S. M. (2015). Risk-based maintenance scheduling in the presence of reward penalty scheme. Electric Power Systems Research, 121, 126–133. doi: https://doi.org/10.1016/j.epsr.2014.12.006
  8. Xiao, N., Huang, H.-Z., Li, Y., He, L., Jin, T. (2011). Multiple failure modes analysis and weighted risk priority number evaluation in FMEA. Engineering Failure Analysis, 18 (4), 1162–1170. doi: https://doi.org/10.1016/j.engfailanal.2011.02.004
  9. Yssaad, B., Khiat, M., Chaker, A. (2014). Reliability centered maintenance optimization for power distribution systems. International Journal of Electrical Power & Energy Systems, 55, 108–115. doi: https://doi.org/10.1016/j.ijepes.2013.08.025
  10. Leite da Silva, A. M., Rezende, L. S., Manso, L. A. F., Anders, G. J. (2010). Transmission expansion planning: A discussion on reliability and “N−1” security criteria. 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems. doi: https://doi.org/10.1109/pmaps.2010.5528652
  11. Handschin, E., Jurgens, I., Neumann, C. (2008). Long term optimization for risk oriented asset management. 16th Power Systems Computation Conference. Glasgow.
  12. Goerdin, S. A. V., Smit, J. J., Mehairjan, R. P. Y. (2015). Monte Carlo simulation applied to support risk-based decision making in electricity distribution networks. 2015 IEEE Eindhoven PowerTech. doi: https://doi.org/10.1109/ptc.2015.7232494
  13. Wang, B., Li, Y., Watada, J. (2011). A New MOPSO to Solve a Multi-Objective Portfolio Selection Model with Fuzzy Value-at-Risk. Lecture Notes in Computer Science, 217–226. doi: https://doi.org/10.1007/978-3-642-23854-3_23
  14. Bardyk, Ye. I. (2014). Modelling and assessment of chances of failure of power systems electrical equipment taking into account the after repair resource restoration level. Visnyk of National Mining University, 3, 82–90.
  15. Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1 (1), 83–98. doi: https://doi.org/10.1504/ijssci.2008.017590
  16. Kosterev, N. V., Bardyk, E. I., Litvinov, V. V. (2015). Preventive risk-management of power system for its reliability increasing. WSEAS TRANSACTIONS on POWER SYSTEMS, 251–258.
  17. Bardyk, E. I. (2014). Models of reliability assessing of electricity supply of auxiliary NPP from external sources with fuzzy defined parameters of failures of equipments. Proceedings of the Institute of Electrodynamics of National Academy of Sciences of Ukraine, 34–38.
  18. Bardyk, E., Bolotnyi, N. (2017). Parametric identification of fuzzy model for power transformer based on real operation data. Eastern-European Journal of Enterprise Technologies, 6 (8 (90)), 4–10. doi: https://doi.org/10.15587/1729-4061.2017.118632
  19. Bardyk, E., Bolotnyi, N. (2018). Development of a model for determining a priority sequence of power transformers out of service. Eastern-European Journal of Enterprise Technologies, 3 (8 (93)), 6–15. doi: https://doi.org/10.15587/1729-4061.2018.133570

Downloads

Published

2018-11-19

How to Cite

Bardyk, E., & Bolotnyi, N. (2018). Development of a mathematical model for cost distribution of maintenance and repair of electrical equipment. Eastern-European Journal of Enterprise Technologies, 6(8 (96), 6–16. https://doi.org/10.15587/1729-4061.2018.147622

Issue

Section

Energy-saving technologies and equipment