Method for configuring the composition of a project team based on the criteria of subjective well-being
DOI:
https://doi.org/10.15587/1729-4061.2019.160651Keywords:
project team formation, personal profile, subjective well-being, team coherence coefficient, evaluation scaleAbstract
The method for configuring a project team by the criterion of subjective well-being was developed. The method is aimed at searching for such a configuration of candidates at which a team with high commonality is formed based on the importance of values (factors) of subjective well-being and their actual satisfaction at the moment of team formation. The method is based on two conceptual provisions-axioms. Firstly, the most appropriate results of construction of a personal profile are achieved during self-analysis of the attitude of a candidate to indicators of subjective well-being. Secondly, ranking makes it possible to construct a series, in which the least achieved indicators act as the most important.
On this basis, it seems possible to compare profiles of candidates with each other and identify the most similar ones. It was theoretically substantiated that the configuration of the closest profiles is a prerequisite for the formation of a positive working environment as a necessary factor for comfortable interaction of team members and a significant integrating factor of involvement in a project. The developed method of the construction of a candidate’s personal profile ensures necessary accuracy and increases reliability of obtained information. Two "working zones" of a personal profile (first five and the following seven comprising 27 indicators) that determine close profiles of candidates were identified empirically. The indicators of the overall total rank for indicators of zones and the team coherence coefficient were introduced to compare the profiles.
To interpret the value of coherence coefficient in the empirical way, the evaluation scale from seven interval zones for the teams consisting of two to ten participants was constructed. Its effectiveness and adequacy were proved based on the results of experimental testing, the possibility of using the criterion of subjective well-being as a parameter for the formation of project teamsReferences
- Wysocki, R. K. (2001). Building Effective Project Teams. John Wiley & Sons, 384.
- Banister-Hazama, D., Moreci, J., England, K. (2012). Increase project team effectiveness: step-by-step. PMI Global Congress Proceedings.
- Individual competence baseline for project, programme and portfolio management (2015). International Project Management Association (IPMA), 431. Available at: http://products.ipma.world/ipma-product/icb/read-icb/
- World Happiness Report (2017). Available at: http://worldhappiness.report/ed/2017/
- Cheung, C., Davis, J., Cui, Q. (2017). Happiness for project managers: framework and empirical analysis. 33rd Annual Association of Researchers in Construction Management (ARCOM) Conference Proceedings. 2017. Available at: http://pm.umd.edu/wp-content/uploads/2017/09/Happiness-for-project-managers-Framework-and-empirical-analysis-2017-ARCOM-vf-2-FINAL.pdf
- Schwartz, S. H., Sortheix, F. M. (2018). Values and subjective well-being. Handbook of well-being. Salt Lake City, UT: DEF Publishers. Available at: https://www.nobascholar.com/chapters/51/download.pdf
- Dzhidar'yan, I. (2013). Psihologiya schast'ya i optimizma. Moscow: Institut psihologii RAN, 268.
- Cooke, H. S. (2018). Project management and team happiness. Available at: https://infoworks.com/project-management-and-team-happiness/
- Emil Berg, M., Terje Karlsen, J. (2014). How project managers can encourage and develop positive emotions in project teams. International Journal of Managing Projects in Business, 7 (3), 449–472. doi: https://doi.org/10.1108/ijmpb-01-2013-0003
- Osakwe, I. (2016). Project team building by the criterion of fulfillment (happiness): main problems and conceptual baselines. Upravlinnia proektamy ta rozvytok vyrobnytstva, 2, 110–124.
- Rach, V., Osakwe, I. (2017). Method to Create Personal Profile of the Project Team Candidate by the Criteria of Well-being Based on Ranking Procedures. International Journal of Innovative Research and Development, 6 (12), 219–232. doi: https://doi.org/10.24940/ijird/2017/v6/i12/120374-284704
- Landon, L. B., Slack, K. J., Barrett, J. D. (2018). Teamwork and collaboration in long-duration space missions: Going to extremes. American Psychologist, 73 (4), 563–575. doi: https://doi.org/10.1037/amp0000260
- Aretoulis, G. (2018). Gender Based Perception of Successful Construction of Project Managers’ Attributes. Social Sciences, 7 (7), 112. doi: https://doi.org/10.3390/socsci7070112
- Jacobsson, C., Nissling, L., Skar, L., Archer, T. (2017). The Effect of Teambuilding on Team Development: A Quasi-Experiment within a Swedish State Authority. Clinical and Experimental Psychology, 03 (03). doi: https://doi.org/10.4172/2471-2701.1000164
- Udo, N., Koppensteiner, S. (2004). What are the core competencies of a successful project manager? Project Management Institute, PMI® Global Congress. Prague. Available at: https://www.pmi.org/learning/library/ore-competencies-successful-skill-manager-8426
- Hassan, M. K., Ilyas, M. A. B. (2016). Change agility across different cultures. Project Management Institute, PMI® Global Congress. Barcelona. Available at: https://www.pmi.org/learning/library/change-agility-different-cultures-10188
- Sautelle, E., Bowles, T., Hattie, J., Arifin, D. N. (2015). Personality, resilience, self-regulation and cognitive ability relevant to teacher selection. Australian Journal of Teacher Education, 40 (4). Available at: https://ro.ecu.edu.au/cgi/viewcontent.cgi?article=2575&context=ajte
- Prewett, M. S., Brown, M. I., Goswami, A., Christiansen, N. D. (2016). Effects of Team Personality Composition on Member Performance: A Multilevel Perspective. Group & Organization Management, 43 (2), 316–348. doi: https://doi.org/10.1177/1059601116668633
- Wu, M., Chen, Y.-H. (2014). A factor Analysis on Teamwork Performance -an Empirical Study of Inter-instituted Collaboration. Eurasian Journal of Educational Research, 55, 37–54. doi: https://doi.org/10.14689/ejer.2014.55.3
- Mathieu, J. E., Tannenbaum, S. I., Donsbach, J. S., Alliger, G. M. (2013). A Review and Integration of Team Composition Models. Journal of Management, 40 (1), 130–160. doi: https://doi.org/10.1177/0149206313503014
- Rossoshanskaya, O. V., Biryukov, O. V. (2010). Forming management team for the project realization per competence approach. Upravlinnia proektamy ta rozvytok vyrobnytstva, 1 (33), 127–146.
- Cherepaha, G. S. (2010). Product-environmental approach to forming the project team within discipline “dynamic leadership in project management”. Upravlinnia proektamy ta rozvytok vyrobnytstva, 2 (34), 59–73.
- Pantileev, S. R. (1991). Samootnoshenie kak emocional'no-ocenochnaya sistema. Moscow: Izd-vo MGU, 100.
- Lysenko, D. E. (2008). Adaptaciya metoda precedentov dlya podderzhki processa otbora i rasstanovki personala proekta. Systemy obrobky informatsiyi, 1 (68), 20–23.
- Alatoom, M. (2014). Metod planirovaniya soderzhaniya myagkih proektov po kriteriyu vazhnosti formiruemyh kompetentnostey. Upravlinnia proektamy ta rozvytok vyrobnytstva, 3 (51), 116–129.
- Rach, V. A. (2014). Metodologicheskie metriki nauki upravleniya proektami. Upravlinnia proektamy ta rozvytok vyrobnytstva, 3 (51), 18–26.
- Larichev, O. I. (2006). Verbal'niy analiz resheniy. Moscow: Nauka, 181.
- Rossoshanskaya, O. V. (2000). Model' upravleniya vysshim uchebnym zavedeniem v sovremennyh usloviyah. Upravlinnia proektamy ta rozvytok vyrobnytstva, 2 (2), 123–127.
- Panina, N. V. (1996). Tekhnolohiya sotsialnoho doslidzhennia. Kyiv: Naukova dumka, 233.
- Hili, Dzh. (2005). Statistika: sociologicheskie i marketingovye issledovaniya. Kyiv: DiaSoftYUP; Sankt-Peterburg: Piter, 638.
- Bushuev, S. D., Morozov, V. V. (2000). Dinamicheskoe liderstvo v upravlenii proektami. Kyiv: Ukrainskaya associaciya upravleniya proektami, 312.
- Burgan, S. C., Burgan, D. S. (2014). One size does not fit all: Choosing the right project approach. PMI Global Congress Proceedings, Project Management Institute. Phoenix.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2019 Valentyn Rach, Ikenna Osakwe, Olena Medvedieva, Olha Rossoshanskaya, Natalia Borulko
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.
A license agreement is a document in which the author warrants that he/she owns all copyright for the work (manuscript, article, etc.).
The authors, signing the License Agreement with TECHNOLOGY CENTER PC, have all rights to the further use of their work, provided that they link to our edition in which the work was published.
According to the terms of the License Agreement, the Publisher TECHNOLOGY CENTER PC does not take away your copyrights and receives permission from the authors to use and dissemination of the publication through the world's scientific resources (own electronic resources, scientometric databases, repositories, libraries, etc.).
In the absence of a signed License Agreement or in the absence of this agreement of identifiers allowing to identify the identity of the author, the editors have no right to work with the manuscript.
It is important to remember that there is another type of agreement between authors and publishers – when copyright is transferred from the authors to the publisher. In this case, the authors lose ownership of their work and may not use it in any way.