Duration of concessions in seaports: european practice and calculation algorithms

Authors

  • Наталия Сергеевна Литвинова Odessa National Maritime University Str. Mechnikov, 34, Odessa, Ukraine, 65011, Ukraine

DOI:

https://doi.org/10.15587/1729-4061.2013.18443

Keywords:

concession, seaports, duration, exogenous approach

Abstract

As a result of a new law "On Sea Ports", adopted in Ukraine, the prospects of attracting significant investments through the concession mechanism are opened up to the port sector. However, new opportunities require from authorized governmental agencies the skills and knowledge corresponding to international practice, particularly in issues relating to setting the duration of concession contract. In this regard, positive world experience is of particular interest. The practice of European sea ports is discussed and analyzed in the paper, the classification of methods for calculating the duration of concession contracts for the port sector, based on three proportionalities, was developed. Also, a decision plan was developed, allowing to choose the most rational approach to solving this issue, that can be very useful for practical application in Ukraine.

Author Biography

Наталия Сергеевна Литвинова, Odessa National Maritime University Str. Mechnikov, 34, Odessa, Ukraine, 65011

Aspirant

The department "The organization of customs control on transport"

References

  1. Notteboom, T. The awarding of seaport terminals in Europe : results from the ITMMA survey commissioned by ESPO [Electronic resource] / T. Notteboom // University of Antwerp. — 2008. — 28p.— Mode of access : http://www.espo.be/images/stories/Publications/studies_reports_surveys /ITMMA SurveyontheAwardingofSeaportTerminalsinEurope2008.pdf
  2. Proposal for a Directive of the European Parliament and of the Council on market access to port services COM (2004) 654 [Electronic resource] / European Commission, Brussels. — 2004. — Mode of access : http://www.yen.gr/media /28247/port_pack13102004.pdf
  3. Notteboom, T.E. The economics behind the awarding of terminals in seaports : Economic issues in the pre-bidding phase [Electronic resource] / T.E. Notteboom, C. Theys, A.A. Pallis, P.W. De Langen // IFSPA Conference, Hong Kong. — 2009.— Mode of access :http: //www. porteconomics.eu
  4. The economics behind the awarding of terminals in seaports : towards a research agenda [Text] / C. Theys, T.E. Notteboom, A.A. Pallis, P.W. De Langen // Research in Transportation Economics. — 2010. — Vol. 27, № 1. — P. 37 — 50.
  5. Policy roundtable on concessions – background note [Electronic resource] / OECD, Paris. — 2007. — Mode of access : http://www.oecd.org/ regreform /sectors/39531515.pdf
  6. Engel, E. M. R. A. Least-present-value-of-revenue auctions and highway franchising [Text] / E. M. R. A. Engel, R. D. Fischer, A. Galetovic // Journal of Political Economy. — 2001. — Vol. 109, № 5. — P. 993 — 1020.
  7. Corporate finance : theory and practice [Text] / P. Quiry, P. Vernimmen, M. Dallocchio et al. — Chichester : John Wiley & Sons, 2005. — 1030 p.
  8. Atrill, P. Financial Management for Decision Makers [Text] / P. Atrill. — 4th ed. — New York : Financial Times / Prentice Hall, 2006. — 580 p.
  9. A simulation model for optimizing the concession period of public-private partnership schemes [Text] / S.T. Ng, J. Xie, Y.K. Cheung, M. Jefferies // International Journal of Project Management. — 2007a. — № 25. — P. 791 — 798.
  10. Shen, L.Y. Alternative concession model for build operate transfer contract projects [Text] / L.Y. Shen, H. Li, Q.M. Li // Journal of Construction Engineering and Management. — 2002. — Vol. 128, № 4. — P. 326 — 330.
  11. Shen, L.Y. Risk concession model for build operate transfer contract projects [Text] / L.Y. Shen, Y.Z. Wu // Journal of Construction Engineering and Management. — 2005. — Vol. 131, № 2. — P. 211 — 220.
  12. Zhang, X. Determining a reasonable concession period for private sector provision of public works and services [Text] / X. Zhang, S. AbouRizk // Canadian Journal of Civil Engineering. — 2006. — № 33. — P. 622 — 631.
  13. Using bargaining-game theory for negotiating concession period for BOT-type contract [Text] / L.Y. Shen, H.J. Bao, Y.Z. Wu, W.S. Lu // Journal of Construction Engineering and Management. — 2007. — Vol. 133, № 5. — P. 385 — 392.
  14. A fuzzy simulation model for evaluating the concession items of public-private partnership schemes [Text] / S.T. Ng, J. Xie, M. Skitmore, Y.K. Cheung // Automation in Construction. — 2007b. — № 17. — P. 22 — 29.
  15. Notteboom, T. (2008). The awarding of seaport terminals in Europe: results from the ITMMA survey commissioned by ESPO, University of Antwerp, 28 p. Retrieved fromhttp://www.espo.be/ images/stories/ Publications/ studies _ reports _surveys/ITMMASurveyontheAwardingofSeaportTerminals inEurope2008.pdf
  16. European Commission (2004). Proposal for a Directive of the European Parliament and of the Council on market access to port services, Brussels, COM (2004) 654. Retrieved from http://www.yen.gr/media/28247/port_pack13102004.pdf
  17. Notteboom, T.E., Theys, C., Pallis, A.A. and De Langen, P.W. (2009). The economics behind the awarding of terminals in seaports: Economic issues in the pre-bidding phase, paper presented at the 2009 IFSPA Conference, Hong Kong. Retrieved from http: //www. porteconomics.eu
  18. Theys, C., Notteboom, T.E., Pallis, A.A., De Langen, P.W. (2010). The economics behind the awarding of terminals in seaports: towards a research agenda. Research in Transportation Economics 27(1): 37-50.
  19. OECD (2007). Policy roundtable on concessions – background note, OECD, Paris. Retrieved from http://www.oecd.org/regreform/sectors/3953 1515.pdf
  20. Engel, E. M. R. A., Fischer, R. D. and Galetovic, A. (2001). Least-present-value-of-revenue auctions and highway franchising. Journal of Political Economy 109 (5): 993-1020.
  21. Quiry, P., Vernimmen, P., Dallocchio, M., Le Fur, Y. and Salvi, A. (2005). Corporate finance: theory and practice. Chichester: John Wiley & Sons, 1030 p.
  22. Atrill, P. (2006). Financial Management for Decision Makers, 4th Edition, New York: Financial Times/Prentice Hall, 580p.
  23. Ng, S.T., Xie, J., Cheung, Y.K. and Jefferies, M. (2007a). A simulation model for optimizing the concession period of public-private partnership schemes. International Journal of Project Management 25: 791-798.
  24. Shen, L.Y., Li, H. and Li, Q.M. (2002). Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management 128 (4): 326 - 330.
  25. Shen, L.Y. and Wu, Y.Z. (2005). Risk concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 131 (2): 211-220.
  26. Zhang, X. and AbouRizk, S. (2006). Determining a reasonable concession period for private sector provision of public works and services. Canadian Journal of Civil Engineering, 33: 622- 631.
  27. Shen, L.Y., Bao, H.J., Wu, Y.Z. and Lu, W.S. (2007). Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management 133 (5): 385-392.
  28. Ng, S.T., Xie, J., Skitmore, M. and Cheung, Y.K. (2007b). A fuzzy simulation model for evaluating the concession items of public-private partnership schemes. Automation in Construction 17: 22-29.

Published

2013-10-30

How to Cite

Литвинова, Н. С. (2013). Duration of concessions in seaports: european practice and calculation algorithms. Eastern-European Journal of Enterprise Technologies, 5(2(65), 53–60. https://doi.org/10.15587/1729-4061.2013.18443