Devising an integrated method for evaluating the efficiency of scrum-based projects in the field of information technology
DOI:
https://doi.org/10.15587/1729-4061.2021.242744Keywords:
integrated method, evaluation, efficiency index, organizational and technological componentsAbstract
An integrated method for evaluating the effectiveness of projects in the field of information technology has been proposed, which could ensure effective management decision-making. All features inherent in the implementation of the Scrum methodology used in the management of information technology projects have been taken into consideration. Ambiguous situations that constantly arise during the implementation of projects affect their effectiveness. Therefore, constant monitoring of the project efficiency would provide opportunities for the project manager to make management decisions promptly, which could contribute to improving the efficiency of the project. The integrated method for evaluating the effectiveness of projects was devised in the class of organizational-technological systems based on the combined use of formalized, intelligent, and expert methods. The results of applying a given method include an increase in the project efficiency by 1.52 % by complying with time limits, a reduction in the overspending of financial resources and losses during the project, as well as the improved productivity of teamwork.
A model of the project efficiency index has been devised, which would ensure taking into consideration the peculiarities of the organizational and technological components of the project, as well as establishing a logical connection between the criteria that characterize the organizational component of the project, on the one hand, and the project-technological component, on the other. The resulting project efficiency index contributes to further research of various alternative scenarios for the project implementation and forecasts the dynamics of achieving strategic goals, as well as the dynamics of process implementation.
The proposed procedure for evaluating the effectiveness of the project under Scrum conditions could become the basis of the information technology of project management and the appropriate decision support system
References
- Sutherland, J., Sutherland, J. J. (2014). Scrum: The Art of Doing Twice the Work in Half the Time. Currency, 256.
- Smith, G. I., Kolesnik, A. L., Lavrischeva, K., Slabospitsky, O. (2010). Improving the process of drafting families of software systems elements of agile methodologies. Programming problems, 2-3, 261–270.
- Kniberg, H. (2007). Scrum and XP from the Trenches (Enterprise Software Development). C4Media, 140.
- Serrador, P., Turner, R. (2015). The Relationship between Project Success and Project Efficiency. Project Management Journal, 46 (1), 30–39. doi: https://doi.org/10.1002/pmj.21468
- Pekoz, E. (2009). The Manager's Guide to Statistics. ProbabilityBookstore.com, 26.
- Belov, M. V., Novikov, D. A. (2020). Methodology of Complex Activity: Foundations of Understanding and Modelling. Springer, 223. doi: https://doi.org/10.1007/978-3-030-48610-5
- Nesticò, A., De Mare, G. (2018). A Multi-Criteria Analysis Model for Investment Projects in Smart Cities. Environments, 5 (4), 50. doi: https://doi.org/10.3390/environments5040050
- Cobb, C. G. (2015). The Project Manager's Guide to Mastering Agile: Principles and Practices for an Adaptive Approach. John Wiley & Sons, 432.
- Dong, W. (2021). Using a system dynamics simulation model to explore the validity of dynamics of Agile software development. Graduate Theses and Dissertations. doi: https://doi.org/10.31274/etd-20210609-47
- Maximini, D. (2015). The Scrum Culture: Introducing Agile Methods in Organizations. Springer, 315. doi: https://doi.org/10.1007/978-3-319-11827-7
- Prokopenko, T. A., Zyelyk, Y. I. (2017). Complex Method of Strategic Decision-Making in Management of Technological Complexes of Continuous Type. Journal of Automation and Information Sciences, 49 (11), 71–79. doi: https://doi.org/10.1615/jautomatinfscien.v49.i11.70
- Prokopenko, T. A., Ladanyuk, A. P. (2014). Information Model of Control of the Continuous Type Technological Complexes in the Class of Organizational and Technological Systems. Journal of Automation and Information Sciences, 46 (9), 78–85. doi: https://doi.org/10.1615/jautomatinfscien.v46.i9.70
- Bol'shakov, A. A. (Ed.) (2006). Intellektual'nye sistemy upravleniya organizacionno-tehnicheskimi sistemami. Moscow: Goryachaya liniya-Telekom, 160.
- Bolshakov, A. A. (2004). Synthesis of intelligent organizational technical control systems. Vestnik Tambovskogo gosudarstvennogo tehnicheskogo universiteta, 10 (4a), 954–959.
- Yudickiy, S. A. (2012). Modelirovanie dinamiki mnogoagentnyh triadnyh setey. Moscow: SINTEG, 112.
- Arhangel'skiy, V. I., Bogaenko, I. V., Grabovskiy, G. G., Ryumshin, N. A. (2005). Integrirovannoe upravlenie proizvodstvom. Organizacionnye i tehnologicheskie aspekty menedzhmenta predpriyatiyami. Kyiv: «Tekhnika», 328.
- Borisov, V. V., Syskov, V. V. (2012). Multi-Agent Modeling of Complex Organizational-Technical Systems with Opposition. Informacionnye tehnologii, 4, 7–14.
- Saati, T. (1993). Prinyatie resheniy. Metod analiza ierarhiy. Moscow: Radio i svyaz', 278.
- Prokopenko, Т. А., Obodovskyi, B. P. (2020). Study of the influence of project team members competence on project efficiency in the field of information technologies. Bulletin of NTU “KhPI”. Series: Strategic Management, Portfolio, Program and Project Management, 2, 50–55. doi: https://doi.org/10.20998/2413-3000.2020.2.7
- Prokopenko, T., Povolotskyi, Y. (2021). Conceptual procedure for estimating the performance project based on flexible scrum methodologies in the field of information technologies. Bulletin of NTU “KhPI”. Series: Strategic Management, Portfolio, Program and Project Management, 2 (4), 60–66. doi: https://doi.org/10.20998/2413-3000.2021.4.8
- Prokopenko, T. A., Lavdanskaya, O. (2021). Information model of project management in the field of information technologies in the conditions of Scrum flexible methodology. International Scientific and Technical Journal "Journal of Automation and Information Sciences", 2, 129–138. Available at: http://jais.org.ua/en/institut/journals-2021/journal-2/informacionnaya-model-upravleniya-proektami-oblasti-informacionnyx-texnologii-v-usloviyax-gibkoi-metodologii-scrum
- Zade, L. (1976). Ponyatie lingvisticheskoy peremennoy i ego primenenie k prinyatiyu priblizhennyh resheniy. Moscow: Mir, 166.
- Zadeh, L. A. (1965). Fuzzy sets. Information and Control, 8 (3), 338–353. doi: https://doi.org/10.1016/s0019-9958(65)90241-x
- Zedeh, L. A. (1989). Knowledge representation in fuzzy logic. IEEE Transactions on Knowledge and Data Engineering, 1 (1), 89–100. doi: https://doi.org/10.1109/69.43406
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Tatiana Prokopenko, Olha Lavdanska, Yaroslav Povolotskyi, Bohdan Obodovskyi, Yaroslav Tarasenko
This work is licensed under a Creative Commons Attribution 4.0 International License.
The consolidation and conditions for the transfer of copyright (identification of authorship) is carried out in the License Agreement. In particular, the authors reserve the right to the authorship of their manuscript and transfer the first publication of this work to the journal under the terms of the Creative Commons CC BY license. At the same time, they have the right to conclude on their own additional agreements concerning the non-exclusive distribution of the work in the form in which it was published by this journal, but provided that the link to the first publication of the article in this journal is preserved.
A license agreement is a document in which the author warrants that he/she owns all copyright for the work (manuscript, article, etc.).
The authors, signing the License Agreement with TECHNOLOGY CENTER PC, have all rights to the further use of their work, provided that they link to our edition in which the work was published.
According to the terms of the License Agreement, the Publisher TECHNOLOGY CENTER PC does not take away your copyrights and receives permission from the authors to use and dissemination of the publication through the world's scientific resources (own electronic resources, scientometric databases, repositories, libraries, etc.).
In the absence of a signed License Agreement or in the absence of this agreement of identifiers allowing to identify the identity of the author, the editors have no right to work with the manuscript.
It is important to remember that there is another type of agreement between authors and publishers – when copyright is transferred from the authors to the publisher. In this case, the authors lose ownership of their work and may not use it in any way.